PLACE920H Major Maintenance Works to Harrington Bridge - Phase 2 (C43017).
Sector: Bridge • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
Derbyshire County Council is seeking an experienced single Contractor to provide maintenance works and repairs to Harrington Bridge, in Sawley. Phase 2 works comprise of following works to the structure: Replacement of existing severely corroded cross bracing sections at the pier, paint the caissons and connection to the bracing. Minor remedial works to the apron in front of the abutments. The exi
- Status
- Closed
- Sector
- Bridge
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about PLACE920H Major Maintenance Works to Harrington Bridge - Phase 2 (C43017).
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Derbyshire County Council is seeking an experienced single Contractor to provide maintenance works and repairs to Harrington Bridge, in Sawley. Phase 2 works comprise of following works to the structure: Replacement of existing severely corroded cross bracing sections at the pier, paint the caissons and connection to the bracing. Minor remedial works to the apron in front of the abutments. The existing bridge deck expansion joints are to be replaced, partially resurface the carriageway and resurface the footways. In order to carry out the works at the pier, a temporary suspended platform will be required to provide a dry and safe working environment at the pier. Temporary scaffolding / platform over the bridge is also required for the access to the works. The Contractor's attention is drawn to the fact that River Trent in this area is very fast flowing and subject to flash flooding. The 1 in 20 years flood level is 31.27mAOD which is above the bottom flange level. All temporary works design is to comply to the Special Requirements of Environment Agency and all current design codes. Temporary works platform to have independent CAT 3 checks. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Bridge |
Article published date | 2026-03-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in United Kingdom
- Customer Information Screens (CIS) LOT 4 SQIP
- Customer Information Screens (CIS) LOT 4 SQIP
- Mansafe System Installation
- Film Scanner and Digitisation System
- Customer Relationship Management (CRM) Solution
- Community Pain Management Service
- Preliminary Market Engagement - ERP System
- Gomeldon Recreation Ground project
