PLACE991H E45026 North Branch Culvert Ironville Refurbishment
One of 10,000+ tenders Taiyo tracks in United Kingdom.
Source: Open Contracting Data Standard (OCDS)
Derbyshire County Council is seeking an experienced single Contractor to provide maintenance works and repairs and all necessary work for the North Branch Culvert Ironville Refurbishment. The culvert consists of three masonry arches, two in water and carries the Midland Rail branch line over the River Erewash, in Ironville, Derbyshire. The works will take place in 2 phases: Phase 1: Excavate behin
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Rail
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about PLACE991H E45026 North Branch Culvert Ironville Refurbishment
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Derbyshire County Council is seeking an experienced single Contractor to provide maintenance works and repairs and all necessary work for the North Branch Culvert Ironville Refurbishment. The culvert consists of three masonry arches, two in water and carries the Midland Rail branch line over the River Erewash, in Ironville, Derbyshire. The works will take place in 2 phases: Phase 1: Excavate behind the headwall and stabilize the embankment. Take up the existing masonry and store at track level or off site. The Environment Agency has designated the location as a category 3 risk area which means the stone cannot be stored at the riverbank. Construct the new training walls and desilt the Western arch and dispose of the excavated material. The river can now pass through all three arches as the Environment Agency has requested. Phase 2: Works to be carried out in accordance with the Environment Agency's optimum time frame, between mid-June and the end of September. The works must allow the river to always pass through two of the three arches. Take up the arch faces, piers and cutwaters. Construct the rc profile as indicated on the drawings. Rebuild the headwall and reinforced fill to the back of the wall, topsoil and grass seed. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Cement, Rail |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United Kingdom
- District Heating Network Performance, Operational Monitoring and Planned Maintenance Services
- Swiftwater and Flood Boat Rescue Operator Training
- Sewer Mapping
- Technology Services Partner Framework (TSPF)
- Technology Services Partner Framework (TSPF)
- Provision and installation of burial vaults
- Diagnostic and Capital Equipment and Related Accessories and Services
- Wheal Jane - Reaction Chamber Mixing Tanks VSDs
