Playground Safety Surface
One of 10,000+ tenders Taiyo tracks in United Kingdom.
Source: Open Contracting Data Standard (OCDS)
The playground is located on the Village Green in the village centre. (///reckoned.wacky.ears). The current wetpour is now failing in several areas, and the sub-base is failing in several areas causing unevenness. The current surface was replaced as part of a playground restoration project in 2012. Another area of the playground is now surfaced with bonded rubber woodchip effect and this has
- Status
- Bidding
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Playground Safety Surface
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The playground is located on the Village Green in the village centre. (///reckoned.wacky.ears). The current wetpour is now failing in several areas, and the sub-base is failing in several areas causing unevenness. The current surface was replaced as part of a playground restoration project in 2012. Another area of the playground is now surfaced with bonded rubber woodchip effect and this has worked well on the heavy clay soil that is susceptible to movement. This is our preferred surface material. Works to comprise but not limited to: Provide suitable Heras fencing (or similar), welfare for your team, equipment and all materials including security for duration of the Works. Remove existing including disposal of all brick edging and wetpour surface and relay with new material to comply with requirement stated herein. Removal and disposal of all existing wetpour estimated at 275m2 but all tendering contractors are to make their own judgement on quantities. Excavate all areas below where wetpour was removed, supply, lay including full compaction of no less than 100mm depth MOT Type 1 stone. Supply and lay no less than 275m2 area at minimum depth 40mm of re-chipped/recycled clean rubberised material bonded in-situ using appropriate polyurethane. Clear site including any surplus materials leaving safe and suitable environment for public use. We are open to alterations to this specification if deemed necessary after inspection. A works and surface guarantee to be provided. For more information please apply to clerk@wisboroughgreenpc.org |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
