Playground Site Clean - up & Preparation
One of 10,000+ tenders Taiyo tracks in Kansas.
Source: Kansas Purchasing Group
The Gardner Edgerton School District ( GESD ) is soliciting proposals from qualified contractors to provide site preparation and repair services in connection with playground replacements at multiple district schools . Work will include site cleanup , topsoil placement , sod installation . Site Cleanup : Removal of construc
- Status
- Closed
- Location
- Kansas, United States of America
- Updated
- 3 Nov 2026
- Source
- Kansas Purchasing Group
ConstructChat
Ask ConstructChat about Playground Site Clean - up & Preparation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Gardner Edgerton School District ( GESD ) is soliciting proposals from qualified contractors to provide site preparation and repair services in connection with playground replacements at multiple district schools . Work will include site cleanup , topsoil placement , sod installation . Site Cleanup : Removal of construction debris , unsuitable soils , and vegetation as required to prepare each site for sod installation and grading . Cleanup must ensure that surfaces are level and free of obstructions prior to the placement of topsoil and sod . • The specific area of cleanup at each site will be agreed upon with the designated GESD point of contact ( POC ) prior to work commencing . • Topsoil Installation : Supply and placement of topsoil at varying depths , as determined by site conditions . • Sod Installation : Supply and installation of high - quality sod . Sod shall be laid tightly , watered immediately , and rolled to ensure proper contact with the soil . No netting shall be left on sod after placement . • Watering : Watering will be conducted by the district • Coordination with Playground Installer : The selected contractor will be required to work closely with the playground installer to ensure site cleanup and preparation occur promptly , after playground installation has concluded at each site . • Contractor shall provide a warranty for sod establishment for 60 days against failure due to improper installation . |
Location
Country | United States of America (USA) |
State | Kansas |
Source
Source | Kansas Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
