Plumbing Contracted Services
Closed · MITN · Last reported Dec 2025
Source: MITN Purchasing Group
A . Scope of Work These specifications are intended to technically describe the nature of the materials , and the workmanship required to complete the project . It is the intent of these specifications to provide guidelines for the construction of public water mains complete and ready in every respect for
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Seaport
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Plumbing Contracted Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A . Scope of Work These specifications are intended to technically describe the nature of the materials , and the workmanship required to complete the project . It is the intent of these specifications to provide guidelines for the construction of public water mains complete and ready in every respect for use by the Owner . Any minor items not specifically called for in the plans and specifications , but which are clearly necessary , are to be included at no increase in the contract price . The Contractor shall supply all labor , material and equipment required for the installation and testing of water mains and appurtenances in full compliance with these Standard County Specifications and Standard Details and in compliance with the project specifications and contract drawings . In all instances project specifications , contract drawings or details shall supersede the requirements found in these specifications . All construction shall begin at a valved stub or at a pressure tapping sleeve and valve when a valved stub has not been provided . All pressure taps to existing water mains shall be made only under the supervision of the City of Alpena ( 354 - 1730 ) or SUEZ ( 354 - 1400 ). The Contractor shall have SUEZ personnel ( 354 - 1400 ) operate all water valves on this project . B . Shop Drawings The Contractor shall be required to supply the Engineer and Owner with detailed shop drawings or certificates of compliance prior to delivery of material for a construction project . Where the item to be supplied is in conformance with these general water main specifications , certificates of compliance will be accepted by the Owner . Should shop drawings be required , the manufacturer shall supply five copies of the drawings to the Owner and Engineer , and shall not ship the material until shop drawing approval has been received from the Owner and Engineer . The Contractor shall submit all shop drawings and / or certificates to the Engineer . The following material will require approval by the Owner prior to use on the project : 1 . Pipe , fittings and joints . 2 . Joint material |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Commercial, Seaport |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
