PM FOR INSPECTION & TESTING FOR FIRE ALARM SYSTEM ( S )
The scope, dates and status of this tender. A free account opens every field.
Source: Indiana Purchasing Group
INSPECTION & TESTING SPECIFICATION FIRE ALARM SYSTEM ( S ) 1 . 01 Scope of Work A . The Contractor must be an authorized Notifier Engineered Systems Distributor with NESCO affiliation to provide on a quarterly basis , all labor and materiel and supervision for a preventative maintenance service as specified herein
- Status
- Closed
- Location
- Indiana, United States of America
- Updated
- 3 Nov 2026
- Source
- Indiana Purchasing Group
ConstructChat
Ask ConstructChat about PM FOR INSPECTION & TESTING FOR FIRE ALARM SYSTEM ( S )
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | INSPECTION & TESTING SPECIFICATION FIRE ALARM SYSTEM ( S ) 1 . 01 Scope of Work A . The Contractor must be an authorized Notifier Engineered Systems Distributor with NESCO affiliation to provide on a quarterly basis , all labor and materiel and supervision for a preventative maintenance service as specified herein for Fire Alarm Systems . a . The term of this contract is to for 730 days ( 2 Years ) and to cover all required testing and inspections during that time period as required below . b . Work shall be bid as a 2 - year lump sum . c . Invoices permitted quarterly upon completion of work for that quarter . d . Work shall include providing approved Emergency Services at an additional charge to the contract . C . The Contractor shall furnish all labor , materials , and supervision required to determine the operational status of each device of the existing Fire Alarm System ( s ). Inspection & Testing service procedures provided by contractor shall conform to NFPA standards as adopted by 675 of the Indiana Administrative Code . D . The minimum number of planned inspections shall be two ( 2 ) times per fiscal year spaced approximately 180 days apart and shall conform to required testing frequencies as tabulated within NFPA 72 for each fire alarm component type . The first Inspection & Test cycle shall be performed upon successfully being awarded the contract . E . Each Inspection & Test site visit shall be prescheduled with the Physical Plant Director at least 72 hours prior to arrival of scheduled visit and directed from a maintenance program initiated and maintained by the Contractor . The program shall be either computer directed or manually operated . A copy of this schedule shall be in the hands of the Physical Plant Director prior to the start of any work . F . All work shall be performed in the presence of an Agency Representative who shall sign the job ticket documenting that the work is complete . The signatures of those performing the work shall appear on all work orders or job tickets . |
Location
Country | United States of America (USA) |
State | Indiana |
Source
Source | Indiana Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More infrastructure tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Veteran Transportation
- Countywide Vending Machine Services with Healthy Options
- Temporary Staffing Services Local and National
- NEW TIRES RETREADS AND TIRE SERVICES
- Youth Suicide Prevention Programming
