The scope of the range project is to facilitate moving the target area closer to the berm , increasing the likelihood of capturing all rounds fired during normal range operation , and to make general improvements to allow for ease of use as well as maintenance . To achieve this task , many things will

Status
Closed
Sector
Airport, Cement, Metal, Power Generation (CCGT), Stadium, Car parking, Automotive
Location
Oklahoma, United States of America
Updated
3 Nov 2026
Source
Oklahoma Purchasing Group

ConstructChat

Ask ConstructChat about Police Firing Range

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Police Firing Range” is a tender record in Taiyo, linked to the Airport sector. It is issued for works, goods, or services related to Oklahoma, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The scope of the range project is to facilitate moving the target area closer to the berm , increasing the likelihood of capturing all rounds fired during normal range operation , and to make general improvements to allow for ease of use as well as maintenance . To achieve this task , many things will have to work in concert and each aspect will have multiple layers . The desired modifications and improvements are as follows : Beginning with the new target area . Note the entire range will be moved 10 yards closer to the western berm , this will allow us to utilize the current 15 yard line for the new 25 yard line while achieving the desired backstop and maintaining no less than 14 targets . This will include a thick concrete pad no less than 39 ’ E - W x 90 ’ N - S x 4 ” to tie into existing pad in front of the current target area . Any dirt removed from this area can be placed on the north side berm or on top of west berm . 15 weld plates no less than 16 ” x16 ” for target frame and pneumatic ram , no less than 18 sticks of 3 ” channel iron ( no less than 3 - 5 ’ metal sticks set in concrete ) for cross tie support for the a knee wall , a shielding wall on the south side and a retaining wall behind the targets . The foundation for the retaining wall will be comprised of a cement foundation with no less than 8 of the previously mentioned sticks of channel iron . Prior to beginning this phase , the turning target system will have to be cut from the existing weld plates and stowed away for future use . The removal of the standing crossties and concrete ( 6 ’ x130 ’) in the current target area will need to be demoed . There is no cost for dumping refuse from the range at a designated location on site at the landfill . No less than 14 barricade supports will be added to the new 25 yard line ( currently the 15 yard line ). The new 50 yard line , no less than 8 ’ x96 ’ x4 ” also with no less than 14 barricades supports . A concrete pad no less than 10 ’ x58 ’ x6 ”, to be poured in front of the classroom for the placement of a no less than 40 ’ shipping container . This will include the removal of an 8 ’ x38 ’ sidewalk . New service ( power and airline ) from shipping container in front of the classroom to a underground vault in the new target area . The vault will protect the connection to the turning targets and will allow for airline dryers and 120v outlets down range . Additional needs to complete outside project include no less than 90 crossties for knee wall ( 3 . 5 ’ x 90 ’ no less than 3 - 4 crossties in height ), for the retaining wall behind the target area ( 3 . 5 ’ x90 ’) and to enclose the south end of the target area , tied in with the knee and retaining wall ( 6 ’ long x 4 ’ tall ). No less than two shipping containers , no less than 40x8x8 - 9 . In good condition and painted to match existing structure . One will be placed in front of the classroom ( running north and south ) and outfitted as a workshop . Electrical panel to provide service down range and additional power / lighting inside the container . Outlets to run air compressors , grinder and a welder . Power ran to this container should come from the classroom . The second shipping container is for storage only and should be set along the north side of the parking lot running east and west . Improvements made to the classroom include , an awning no less than 15 ’ x40 ’ , finishing the interior walls ( 114 ’ for 10 ’ ceiling ) ( 35 4x8 panels already on site ), adding a second bathroom ( no less than 5 ’ x8 ’ adjacent to existing bathroom ) and a concrete ramp into the classroom

Location

Country

United States of America (USA)

State

Oklahoma

Source

Source

Oklahoma Purchasing Group

URL

More Details

Record type

Tender

Sector

Airport, Cement, Metal, Power Generation (CCGT), Stadium, Car parking, Automotive

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender