logo

Potae Avenue Rising Main

Closed · New Zealand

Source: New Zealand Government Electronic Tenders Service (GETS)

Tender
Closed

A new wastewater pump station and a rising main is required to support the growth in the southern Taruheru area and provide greater resilience from flooding/surcharge of wastewater from the network. The existing Campion Road pump station currently servicing the area is at its estimated capacity, and a new pump station is required near the Nelson Road - Potae Avenue intersection with sufficient cap

Status
Closed
Sector
Waste Processing and Treatment, Road, Water Supply and Storage, Government
Location
New Zealand
Updated
3 Nov 2026
Source
New Zealand Government Electronic Tenders Service (GETS)

ConstructChat

Ask ConstructChat about Potae Avenue Rising Main

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Potae Avenue Rising Main” is a tender record in Taiyo, linked to the Waste Processing and Treatment sector. It is issued for works, goods, or services related to New Zealand.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

A new wastewater pump station and a rising main is required to support the growth in the southern Taruheru area and provide greater resilience from flooding/surcharge of wastewater from the network. The existing Campion Road pump station currently servicing the area is at its estimated capacity, and a new pump station is required near the Nelson Road - Potae Avenue intersection with sufficient capacity to service the future growth area.The existing DN225AC rising main from the Campion Road pump station is close to the end of its expected life. A new DN250 PE100 rising main from the new pump station to the Lytton Road discharge point (835m away from the pump station) will convey majority of flows from the catchment and reduce the flows through the existing AC rising main. GDC still utilise the existing Campion Road pump station and the existing AC rising main for the reduced flows and to achieve redundancy in the wastewater system.We are looking for an experienced and qualified Contractor to construct the DN250 rising main of 685m and approximately 160m of 300mm diameter gravity pipe to connect to the Lytton Road Interceptor.There are seven attachments with this Request for Proposal as follows:1. 25-64 Potae Avenue Rising Main - RFP2. 25-64 Potae Avenue Rising Main - RFP Response Form3. 25-64 Potae Avenue Rising Main - Schedule of Prices4. 25-64 Potae Avenue Rising Main - Contract Documents5. 25-64 Potae Avenue Rising Main - T019890001R0016. 25-64 Potae Avenue Rising Main - T019890001-POTAE AV RISING MAIN-FOR TENDER DRAWINGS7. 25-64 Potae Avenue Rising Main - Schedules A3 and A4

Location

Country

New Zealand

Source

Source

New Zealand Government Electronic Tenders Service (GETS)

URL

More Details

Record type

Tender

Sector

Waste Processing and Treatment, Road, Water Supply and Storage, Government

Article published date

2026-10-16

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender