logo

Preliminary and Final Geometric Layout and Final Design of TH 10

Bids closed Mar 2026 · Minnesota · Last reported Mar 2026

Source: Minnesota Purchasing Group

Tender
Closed

Project Overview State is in need of professional and technical assistance to provide a detailed preliminary , and final geometric layout , and final design of Trunk Highway ( TH ) 10 . State Project ( SP ) 7102 - 146 is a unbonded concrete overlay with J - turns at 176th , 172nd , 168th , and Waco St , signal repla

Status
Closed
Sector
Waste Processing and Treatment, Bridge, Government, Water Supply and Storage, Cement, Power Transmission, Power Generation (CCGT), Road
Location
Minnesota, United States of America
Updated
3 Nov 2026
Source
Minnesota Purchasing Group

ConstructChat

Ask ConstructChat about Preliminary and Final Geometric Layout and Final Design of TH 10

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Preliminary and Final Geometric Layout and Final Design of TH 10” is a tender record in Taiyo, linked to the Waste Processing and Treatment sector. It is issued for works, goods, or services related to Minnesota, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Project Overview State is in need of professional and technical assistance to provide a detailed preliminary , and final geometric layout , and final design of Trunk Highway ( TH ) 10 . State Project ( SP ) 7102 - 146 is a unbonded concrete overlay with J - turns at 176th , 172nd , 168th , and Waco St , signal replacement at CR 43 , Americans with Disabilities Act ( ADA ) improvements , new fiber optics and trail resurfacing at the interchange of County State Aid Highway ( CSAH ) 14 / 15 on TH 10 . Project termini are from 0 . 2 miles east of Eagle Lake Rd in Big Lake to 350 ft west of Joplin Ave in Elk River ( Eastbound ( EB ) and Westbound ( WB )). SP 7102 - 148 is a full reconstruct with ADA improvements , signal replacement at Eagle Lake Rd , and fiber optics . Project termini are from 0 . 3 miles west of MN 25 to 0 . 2 miles east of Eagle Lake Rd in Big Lake ( EB and WB ). The letting date for both SP 7102 - 146 and SP 7102 - 148 is January 31 , 2029 . SP 7102 - 146 This contract is for the development of preliminary and final geometric layout and a biddable final plan - set and special provisions for TH 10 unbonded overlay project from Big Lake to Elk River . Overview of Project 1 . Use the Intersection Control Evaluation ( ICE ) preferred alternative for 176th , 172nd , 168th , in Big Lake and Waco St . in Elk River to design the preferred alternative ( J - turn ). 2 . Prepare a preliminary and final level 1 geometric layout and final design for the unbonded overlay of US 10 from 0 . 2 miles east of Eagle Lake Rd in Big Lake to 350 ft west of Joplin Ave in Elk River and the reconstruction of the bituminous multi - use trail on CSAH 14 / 15 . 3 . Exception area from 840 feet east of 168th St to 0 . 67 miles west of the CSAH 14 / 15 Interchange . This area pavement fix will be a mill and overlay and the HTCB will be replaced . 4 . Develop design memo in coordination with the level 1 geometric layout . 5 . Prepare access improvement memo for crossovers at 190th Ave NW , 147th St NW , 146th St NW , and Yankton St NW in Big Lake Township . 6 . Develop ICE memo and signal plans for signal replacement at CR 43 . 7 . Public engagement with businesses , residents , and local units of government . 8 . Conduct Subsurface Utility Engineering ( SUE ). 9 . Wetland Delineation , aquatic permits , and flood plain analysis of the project corridor . 10 . Environmental document for project and coordination with State ’ s Cultural Resources Unit ( CRU ) regarding any potential historic properties . 11 . Participate in utility coordination . 12 . Evaluate condition and hydraulics of all existing storm sewer facilities ( i . e . culverts , catch basins , basins , etc .) within project limits and provide Existing Storm Sewer Conditions and Preliminary and Final Hydraulic Report for State review and approval . 13 . Design storm sewer for the project . 14 . Review existing street lighting along US 10 and additional lighting at new intersection modifications . 15 . Signing revisions . 16 . ADA improvements throughout the corridor . Must meet newest standards . 17 . Coordination with the City of Big Lake and Sherburn County to incorporate lighting replacement plans . 18 . Design guardrail replacement at the bridge piers at the CSAH 14 / 15 intersection ( tangent terminal ). 19 . Develop construction staging and detour routes for CSAH 14 / 15 and local traffic .

Location

Country

United States of America (USA)

State

Minnesota

Source

Source

Minnesota Purchasing Group

URL

More Details

Record type

Tender

Sector

Waste Processing and Treatment, Bridge, Government, Water Supply and Storage, Cement, Power Transmission, Power Generation (CCGT), Road

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender