Prequalification : MSI OR # 6 Fit - Out and Surgical Light Replacement
Sector: Hospital • Location: Connecticut, United States of America
Source: Connecticut Purchasing Group
This project consists of the fit - out of approximately 433 square feet of existing shell space within the second - floor Operating Room ( OR ) suite . The scope of work includes , but is not limited to , the installation of a new surgical light , anesthesia boom , and video integration boom within OR # 6 . Work
- Status
- Closed
- Sector
- Hospital, Education
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about Prequalification : MSI OR # 6 Fit - Out and Surgical Light Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This project consists of the fit - out of approximately 433 square feet of existing shell space within the second - floor Operating Room ( OR ) suite . The scope of work includes , but is not limited to , the installation of a new surgical light , anesthesia boom , and video integration boom within OR # 6 . Work will also include associated architectural finishes , electrical systems , mechanical systems , fire protection modifications , and fire alarm modifications necessary to support the new equipment and comply with applicable codes and standards . In addition , Operating Rooms 1 through 5 will receive new surgical light booms . The project will require detailed coordination with existing imaging systems , operating room booms and lights , and video integration equipment to ensure proper installation and operational functionality within the existing OR environment . The contractor will also be painting the corridors and PACU . The renovation will require working in an active / occupied operating room suite setting . Infection Control ( ICRA ) and Life Safety ( ILSM ) measures will need to be followed on this project . Renovation scope includes finishes , MEP / FP distribution and tie - ins to existing infrastructure , plumbing , medical gas piping , fire alarm , data and security . |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Hospital, Education |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hospital tenders in United States of America
- Police and Fire Joint Operations Facility
- FURNISHING AND DELIVERY OF TOXICOLOGY SERVICES
- Certified Recovery Peer Specialists and Substance Use Case Managers Pinellas Medication Assisted Treatment and Emergency Referrals to Services Matters
- RFP 845402021DH Medical Administrator and Pharmacy Benefit Manager
- Emergency Medical TransportAdvanced Life SupportAmbulance Services
- Emergency Medical Services EMS Feasibility Study
- RFP 1003902023KA Temporary Medical Staffing Services
- Medical Examiner Morgue Body Cooler Racks
