PreQualification of Bidders for Chaboya Improvements
Sector: Cement • Location: San Jose, California, United States of America
Source: Open Gov Tenders
The Work will include furnishing all labor, supervision, materials, equipment and incidentals which are necessary to perform the following tasks:Site Improvements - Alterations to the staff parking area, various utility alterations and additions, fencing alterations, and new stormwater control features with associated landscaping.Building A - Offices:Base Bid: Fire alarm replacement throughout bui
Tender Information FAQ
Tender Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Work will include furnishing all labor, supervision, materials, equipment and incidentals which are necessary to perform the following tasks:Site Improvements - Alterations to the staff parking area, various utility alterations and additions, fencing alterations, and new stormwater control features with associated landscaping.Building A - Offices:Base Bid: Fire alarm replacement throughout building.Bid Alternate: Interior remodeling of dispatch office and two storerooms, and associated work in breakroom and to the building path of travel. Interior finishing and related construction including interior partitions and doors; new fire-protection elements, plumbing, HVAC, and electrical work.Building B - Maintenance Training: Fire alarm replacement.Building C - Repair Shops: Demolition of existing canopy. Addition of 1-story area for two repair bays for articulated buses. Interior remodeling of shop and storage areas. New steel framing system with shallow foundations; CMU base wall with ribbed metal siding exterior with steel framing backup, unit skylights, and ribbed metal roof; industrial equipment; and plumbing, HVAC, and electrical work. Interior finishing and related construction including interior partitions and doors; fire suppression elements and interconnection to existing system, and plumbing, HVAC, and electrical work. Fire alarm replacement.Building D - Vault: Fire alarm replacement.Building E1 - Fuel Island: Fire alarm replacement.Building E2 - Tire Shop: 1-story canopy with enclosed area for new tire shop storage added to existing 1-story bus wash canopy. New steel framing system on shallow foundations; CMU base wall with ribbed metal siding exterior with steel framing backup, unit skylights, and ribbed metal roof; industrial equipment, and plumbing, HVAC, and electrical work. Installation of salvaged furnishings, fixtures, and equipment as indicated.Building F - Steam Clean Bay: New lift, supporting concrete slab; and associated plumbing and electrical work. Interior cleaning as needed to facilitate new work.Remove & Replace complete Fire Alarm System in Buildings A, B, C, D & E1.<strong>The estimated cost for the Project is in the range of $6.2 million to $7.0 million.</strong> |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
