PREVENTATIVE MAINTENANCE AND REPAIRS FOR THE BACKFLOW PREVENTION VALVES
Location: Indiana, United States of America
Source: Indiana Purchasing Group
The Contractor shall furnish all labor , materiel , parts and supervision required to perform testing of Backflow Prevention Valves including repair and replacement of components and inspection , pertaining to the operation of the system as listed on the Preventative Maintenance Checklist . The minimum number of pl
- Status
- Closed
- Location
- Indiana, United States of America
- Updated
- 3 Nov 2026
- Source
- Indiana Purchasing Group
ConstructChat
Ask ConstructChat about PREVENTATIVE MAINTENANCE AND REPAIRS FOR THE BACKFLOW PREVENTION VALVES
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall furnish all labor , materiel , parts and supervision required to perform testing of Backflow Prevention Valves including repair and replacement of components and inspection , pertaining to the operation of the system as listed on the Preventative Maintenance Checklist . The minimum number of planned inspections shall be ONE for one fiscal year . The inspection shall be scheduled with the site Physical Plant Director upon award of the contract . Each preventative work period shall be prescheduled and directed from a maintenance management program initiated and maintained by the Contractor . The program may computer directed , or manually operated . A copy of this schedule will be presented to the Physical Plant Director prior to initiating the work . All work shall be performed in the presence of an Agency Representative who shall sign documentation , provided by the Contractor , that the work is complete . The signature of the foreman of the crew performing the work shall appear on all site prepared documents . A report shall be furnished to the Physical Plant Director within 14 days after each examination or Emergency Service and indicate the Scope of Work performed and status of each device , conditions requiring further attention and the name of the Agency Representative present . |
Location
Country | United States of America (USA) |
State | Indiana |
Source
Source | Indiana Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More infrastructure tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Veteran Transportation
- Countywide Vending Machine Services with Healthy Options
- Temporary Staffing Services Local and National
- NEW TIRES RETREADS AND TIRE SERVICES
- Youth Suicide Prevention Programming
