Principal Contractor for Moa Island (PHCC) Upgrades in St Paul & Kubin Communities
One of 10,000+ tenders Taiyo tracks in Australia.
The Construction Phase of the Project will see the Contractor proceed with the approved Detailed Designs as provided in Appendix A of the Tender Package. The Contract comprises four separable portions, as detailed below. Separable Portion 1 – St Pauls PHCC Upgrade Separable Portion 1 comprises the demolition and replacement of the St Pauls Primary Health Care Centre (PHCC) on Moa Island. Separable
- Status
- Closed
- Sector
- Hospital, Commercial
- Location
- Australia
- Updated
- 3 Nov 2026
- Source
- queensland
ConstructChat
Ask ConstructChat about Principal Contractor for Moa Island (PHCC) Upgrades in St Paul & Kubin Communities
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Construction Phase of the Project will see the Contractor proceed with the approved Detailed Designs as provided in Appendix A of the Tender Package. The Contract comprises four separable portions, as detailed below. Separable Portion 1 – St Pauls PHCC Upgrade Separable Portion 1 comprises the demolition and replacement of the St Pauls Primary Health Care Centre (PHCC) on Moa Island. Separable Portion 2 – Staff Accommodation Building Upgrades Separable Portion 2 comprises a renovation to the staff accommodation building. Notable scope items include the replacement of roof sheeting, air conditioning units and kitchen joinery. The site is adjacent to the St Pauls PHCC. The scope is shown in the current Architectural Drawings for the St Pauls PHCC. Separable Portion 3 – 3 Bedroom Dwelling Upgrades Separable Portion 3 comprises a renovation to the 3 Bedroom Dwelling. Notable scope items include the replacement of roof sheeting and air conditioning units. The site is adjacent to the St Pauls PHCC. The scope is shown in the current Architectural Drawings for the St Pauls PHCC. Separable Portion 4 – Kubin PHCC Separable Portion 4 comprises a renovation to the Kubin PHCC on Moa Island. Notable scope items include enclosing and air conditioning the waiting room, extending the upstairs balcony and integrating art into the PHCC. |
Original sector | Building Trade & Repairs & Maintenance Services |
Location
Country | Australia |
Source
Source | queensland |
URL |
More Details
Record type | Tender |
Sector | Hospital, Commercial |
Article published date | 2026-10-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hospital tenders in Australia
- Atenolol Tablets
- Supercare Pharmacies Initiative Nursing - Stage 3
- Rural and Regional Public Sector Residential Aged Care Services (PSRACS) Revitalisation Strategy Stage 1: Orbost Head Contractor
- Maryborough Hospital Redevelopment - Building Engineering Services
- Victorian State Trauma Registry
- Maryborough Hospital Redevelopment - Relevant Building Surveyor
- Maryborough Hospital Redevelopment - Project Management Consultant
- Supercare Pharmacies Initiative Nursing - Stage 3
