PRJ_31139 - Maintain and Manage 951 AC Shared Supply Resident EV Charge Points
One of 10,000+ tenders Taiyo tracks in United Kingdom.
Source: Find a Tender Service (UK)
Since Westminster City Council (WCC) carried out a pilot test of shared power supply charge points, or lamp column charge points (LCCP), alongside resident parking bays in 2017, the council has embarked on several significant expansion programmes resulting in a total of 2,332 LCCP being present on the WCC maintained public highway as of July 2026. This service is predominantly aimed at the Westmi
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Road, Car parking, Automotive, Power Generation (CCGT)
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about PRJ_31139 - Maintain and Manage 951 AC Shared Supply Resident EV Charge Points
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Since Westminster City Council (WCC) carried out a pilot test of shared power supply charge points, or lamp column charge points (LCCP), alongside resident parking bays in 2017, the council has embarked on several significant expansion programmes resulting in a total of 2,332 LCCP being present on the WCC maintained public highway as of July 2026. This service is predominantly aimed at the Westminster residents, with just over 30% of parking permit holders owning an EV. This contract is currently let to Siemens Plc, with Ubitricity acting as a sub-contractor, and consists of 951 charge points (all manufactured by Ubitricity). All charge points were purchased by WCC through a concessionary contract procured via the TfL GULCS Framework. They have a working life of at least 10 years and are compatible with the Open Charge Point Protocol (OCPP) version 1.6, so there is an opportunity for a Supplier to provide a service for at least 5 years once the contract has concluded. |
Budget |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Electric Vehicles (EVs), Road, Car parking, Automotive, Power Generation (CCGT) |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Electric Vehicles (EVs) tenders in United Kingdom
- Cross-pavement charging for electric vehicles
- EV Charging Infrastructure
- 2526-0294 Local Electric Vehicle Infrastructure (LEVI) Procurement for 5kw lamp column Electric Vehicle Infrastructure
- Oxfordshire Micromobility scheme
- Electric Vehicle Leasing - Salary Sacrifice
- Integrated Micromobility Services 2027
- Vehicle Charging Infrastructure
- Gen5 Consult - Transport, Highways & Infrastructure Consultancy Framework 2026 - 2030
