Professional Catering Services
Sector: Commercial • Location: Arkansas, United States of America
Source: Arkansas Purchasing Group
a . Demolition and Surface Preparation i . Perform a full chip - out of all existing plaster and interior coating materials down to a sound substrate . Partial plaster removal is not acceptable . ii . Properly dispose of all debris in accordance with applicable regulations . iii . Inspect the pool shell and repair
- Status
- Closed
- Sector
- Commercial
- Location
- Arkansas, United States of America
- Updated
- 3 Nov 2026
- Source
- Arkansas Purchasing Group
ConstructChat
Ask ConstructChat about Professional Catering Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | a . Demolition and Surface Preparation i . Perform a full chip - out of all existing plaster and interior coating materials down to a sound substrate . Partial plaster removal is not acceptable . ii . Properly dispose of all debris in accordance with applicable regulations . iii . Inspect the pool shell and repair any cracks , voids , or substrate imperfections prior to replastering . All repairs need to be approved by the Waukegan Park District first . iv . Prepare substrate per SGM BOND KOTE manufacturer ’ s specifications . v . Apply bonding agents per SGM BOND KOTE manufacturer specifications . vi . Protect all fittings , lights , drains , and other embedded components during preparation and plastering . b . Replastering and Finishing i . Apply new plaster finish in full compliance with SGM DIAMOND BRITE manufacturer ’ s recommendations and standards for commercial / public pools . ii . Finish color to be the SGM DIAMOND BRITE SUPER BLUE DECK FINISH . iii . Achieve a uniform , smooth , watertight surface across all pool areas . SGM DIAMOND BRITE thickness should be 3 / 8 ” to 1 / 2 ”. iv . Allow for proper cure time prior to filling the pool , as specified by the SGM DIAMOND BRITE manufacturer . c . Site Maintenance and Cleanup i . Contractor shall maintain a clean , safe , and orderly worksite throughout the duration of the project . ii . Remove all waste , debris , and surplus materials upon completion . iii . Restore any disturbed areas of the surrounding pool deck or facility to pre - construction conditions . |
Location
Country | United States of America (USA) |
State | Arkansas |
Source
Source | Arkansas Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Commercial |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Trophies Plaques Awards ETC
- Painting Services for Building Exteriors Infrastructure Systems and Pressure Washing
- OAM Learning Management System
- CYBER SECURITY PENETRATION TESTING
- PROMOTIONAL ITEMS SOUVENIRS
- Proposed Services at Former Ingleside Recreation Center
- Towing Services CityOwned Vehicles Light and Heavy Duty
