PROFESSIONAL ENGINEERING SERVICES FOR WASTEWATER COLLECTION SYSTEM
Bids closed Apr 2026 · Florida · Last reported Apr 2026
Source: Florida Purchasing Group
The services described below establish the City ’ s expected minimum scope . Respondents may recommend refinements , sequencing , or additional tasks that will improve grant eligibility , constructability , legal compliance , affordability , phasing , and speed of delivery . The City reserves the right to negotiate final scope
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Power Generation (CCGT)
- Location
- Florida, United States of America
- Updated
- 3 Nov 2026
- Source
- Florida Purchasing Group
ConstructChat
Ask ConstructChat about PROFESSIONAL ENGINEERING SERVICES FOR WASTEWATER COLLECTION SYSTEM
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The services described below establish the City ’ s expected minimum scope . Respondents may recommend refinements , sequencing , or additional tasks that will improve grant eligibility , constructability , legal compliance , affordability , phasing , and speed of delivery . The City reserves the right to negotiate final scope and task order structure . 4 . 1 Project Kickoff , Data Collection , and Existing Conditions Assessment • Conduct a kickoff meeting with City staff and stakeholders to confirm project goals , available data , funding constraints , service expectations , and decision points . • Review prior Archer wastewater planning and design materials , including the City ’ s earlier engineering RFQ and prior consultant agreements , deliverables , mapping , estimates , and permitting assumptions . • Collect and review available GIS , record drawings , parcel data , utility customer data , development data , topographic information , roadway and right - of - way information , and prior utility studies . • Identify data gaps and recommend additional survey , geotechnical , utility locating , easement , environmental , or modeling tasks needed for implementation . 4 . 2 Service Area , Growth , and Buildout Analysis • Define the wastewater service area to include all current Archer water system customers and analyze practical phasing for universal service coverage . • Evaluate future wastewater service needs for development and redevelopment areas identified in the City ’ s zoning map , land development regulations , comprehensive planning materials , growth assumptions , and related utility policy documents . • Prepare wastewater flow projections , loading assumptions , buildout scenarios , and phasing assumptions suitable for engineering design , permitting , financial planning , and ordinance support ... |
Location
Country | United States of America (USA) |
State | Florida |
Source
Source | Florida Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
