Project # 999 - 26 - 341 - Utilities , Stormwater and Landscape Campuswide Study
The scope, dates and status of this tender. A free account opens every field.
Source: Georgia Purchasing Group
1 . Utilities Inventory and Assessment • Conduct a comprehensive existing conditions assessment supported by quantitative analysis , including but not limited to : o Utilization metrics o Infrastructure capacity and documented system conditions . o Existing system constraints and development capacity analysis o Establish d
- Status
- Closed
- Sector
- Stadium, Education, Commercial, Residential
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about Project # 999 - 26 - 341 - Utilities , Stormwater and Landscape Campuswide Study
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Utilities Inventory and Assessment • Conduct a comprehensive existing conditions assessment supported by quantitative analysis , including but not limited to : o Utilization metrics o Infrastructure capacity and documented system conditions . o Existing system constraints and development capacity analysis o Establish documented baseline metrics o Clearly document data sources , assumptions , methodologies , and analytical tools used . o Leverage existing data , reports , and studies to evaluate each system ’ s ownership , physical condition , capacity , reliability , serviceability , and functional constraints . 2 . Stakeholder Engagement and Operational Analysis • Facilitate broad engagement with plan stakeholders including ( but not limited to ): o Sustainability o Campus Operations departments ( Plant Operations , Landscape & Grounds , Building Services , Emergency Management , etc .) o Event & Venue Management ( EVM ) o University Information Technology Services o Planning Design & Construction ( Campus Planning , Design & Construction , Real Estate ) o Environmental Health & Safety • Lead structured conversations around opportunities and constraints related to campus landscape development . 3 . Needs Analysis • Analyze current and projected demand across campus locations . • Integrate findings from stakeholder interviews and engagement . • Analyze existing data , design standards and reports . 4 . Strategic Alignment and Prioritization • Evaluate existing and proposed projects to define a prioritization framework that reflects the goals outlined in the University Strategic Plan and alignment with the KSU Campus Master Plan . Evaluate opportunities to enhance the sustainability of the campus utilities in alignment with the KSU Sustainability Master Plan . 5 . Plan Development • The Consultant shall develop a data - driven , technically supported Utilities Plan that establishes measurable baselines , evaluates alternatives using defensible methodologies , and provides an adaptable decision - making framework for long - term implementation . o Develop programmatic and infrastructure demand forecasts using transparent , defensible assumptions . o Prepare multiple growth and funding scenarios ( e . g ., low , moderate , high growth ; constrained funding ; accelerated investment ). o Quantify projected impacts of each scenario on capital investment , infrastructure systems , and operational performance . o Provide sensitivity analyses to illustrate risk factors and key variables . o Recommend short -, medium -, and long - term design strategies that address prioritization of system upgrades to implement over time . o Include guidance on alternate strategies for development to accommodate evolving funding availability and programmatic needs . o Evaluate alternative development strategies using measurable criteria , including capital cost , life - cycle cost , operational efficiency , institutional impact , phasing feasibility , risk profile o Provide comparative matrices summarizing advantages , trade - offs , and quantified impacts of alternatives . o Develop a phased implementation framework that remains adaptable to evolving funding availability , institutional priorities , and programmatic changes . o Provide guidance on triggers or decision thresholds that initiate future phases . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Stadium, Education, Commercial, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Stadium tenders in United States of America
- Graphic Designer Request for Proposals
- Electric CostofService Analysis Rate Design Study
- RFQ 933002022JM Roof Drain at Scope Arena Unclogging and Cleaning Services
- 23B38LL Ocean Center Floor Boxes
- 0.51 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps and pavement markings on Howard Street from Stadium Drive to Oakland Drive in the city of Kalamazoo, Kalamazoo County. This is a Local Agency project. 4.00 % DBE participation required
- Resurfacing and intersection improvements on Court Street from Stadium Drive to Hilltop Drive in Pekin.
- HMA resurfacing with pavement patching, dowel bar retrofitting, thermoplastic pavement markings and signage on University Drive from University Park Drive to Stadium Drive on the SIU Campus in Edwardsville.
- HMA resurfacing with pavement patching, dowel bar retrofitting, thermoplastic pavement markings and signage on University Drive from University Park Drive to Stadium Drive on the SIU Campus in Edwardsville.
