logo

Project "MoKA" (Moabit Kohleausstieg = Moabit Coal Phase Out) Lot 1 "Boiler Island" & Lot 2 "Fuel Logistics"

Source: Open Tenders

Tender
Closed

Lot 1 includes boiler, flue gas treatment, flue gas condensation (or other measurements to optimize efficiency), ash handling & storage, piping (incl. district heating), chimney(s), secondary steel construction for platforms, water and sewage systems including the power supply 200V-10kV and a 110kV/10KV-transformer. The power and utility supply for the logistics lot (Lot 2) shall be part of lot 1.

Tender Information FAQ

Tender Information

5 Q
The tender "Project "MoKA" (Moabit Kohleausstieg = Moabit Coal Phase Out) Lot 1 "Boiler Island" & Lot 2 "Fuel Logistics"" is a Tender record in Taiyo, linked to the Biomass, Geothermal, Warehouse, Power Transmission, Steel, Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Rail, Metal, Commercial, Manufacturing (Industrial), Cable car, Seaport, Telecommunications, Automotive sector. It is issued for works, goods, or services related to the local region, , Germany.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Lot 1 includes boiler, flue gas treatment, flue gas condensation (or other measurements to optimize efficiency), ash handling & storage, piping (incl. district heating), chimney(s), secondary steel construction for platforms, water and sewage systems including the power supply 200V-10kV and a 110kV/10KV-transformer. The power and utility supply for the logistics lot (Lot 2) shall be part of lot 1.The contractor is in charge of engineering, purchasing, construction & commissioning of its scope. The entire system must be certified with CE conformity. The execution of lot 1 shall be completed in one phase while the logistics lot (lot 2) shall be executed in 2 phases.The boiler shall be a heat only boiler that is fired with biomass. (forest residue & landscaping material, P63) The boiler island shall have a thermal output of 90 MW. The plant shall be operated via an existing control room from DCS T3000. The emissions of the plant shall meet the lowest BREF limits.The erection of the boiler island takes place next to an existing coal yard, the construction and commissioning will thus be in a brown field situation. The commissioning of phase 1 is scheduled for Q4 2025.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data