Project "MoKA" (Moabit Kohleausstieg = Moabit Coal Phase Out) Lot 1 "Boiler Island" & Lot 2 "Fuel Logistics"
Source: Open Tenders
Lot 1 includes boiler, flue gas treatment, flue gas condensation (or other measurements to optimize efficiency), ash handling & storage, piping (incl. district heating), chimney(s), secondary steel construction for platforms, water and sewage systems including the power supply 200V-10kV and a 110kV/10KV-transformer. The power and utility supply for the logistics lot (Lot 2) shall be part of lot 1.
Tender Information FAQ
Tender Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Lot 1 includes boiler, flue gas treatment, flue gas condensation (or other measurements to optimize efficiency), ash handling & storage, piping (incl. district heating), chimney(s), secondary steel construction for platforms, water and sewage systems including the power supply 200V-10kV and a 110kV/10KV-transformer. The power and utility supply for the logistics lot (Lot 2) shall be part of lot 1.The contractor is in charge of engineering, purchasing, construction & commissioning of its scope. The entire system must be certified with CE conformity. The execution of lot 1 shall be completed in one phase while the logistics lot (lot 2) shall be executed in 2 phases.The boiler shall be a heat only boiler that is fired with biomass. (forest residue & landscaping material, P63) The boiler island shall have a thermal output of 90 MW. The plant shall be operated via an existing control room from DCS T3000. The emissions of the plant shall meet the lowest BREF limits.The erection of the boiler island takes place next to an existing coal yard, the construction and commissioning will thus be in a brown field situation. The commissioning of phase 1 is scheduled for Q4 2025. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
