logo

Provision of Interim Enterprise Server Infrastructure (1-3 Year Horizon)

The scope, dates and status of this tender. A free account opens every field.

Source: Open Contracting Data Standard (OCDS)

Tender
Complete

Objectives • Ensure short- to medium-term continuity of business-critical applications (e.g., QL housing management, SQL databases, Active Directory, File Server, and local backup services). • Provide a secure and resilient on-premises server environment that supports premises-managed software such as QL, while complementing St Basil's longer-term hybrid/cloud strategy. • Avoid unnecessary over-in

Status
Closed
Sector
Metal, Power Generation (CCGT), Telecommunications, Data Center
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about Provision of Interim Enterprise Server Infrastructure (1-3 Year Horizon)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Provision of Interim Enterprise Server Infrastructure (1-3 Year Horizon)” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Objectives • Ensure short- to medium-term continuity of business-critical applications (e.g., QL housing management, SQL databases, Active Directory, File Server, and local backup services). • Provide a secure and resilient on-premises server environment that supports premises-managed software such as QL, while complementing St Basil's longer-term hybrid/cloud strategy. • Avoid unnecessary over-investment in hardware that may be redundant once certain systems move fully to the cloud. • Reduce the risk of service disruption. • Ensure compliance with UK data protection, cyber security, and social housing regulatory requirements. Scope of Supply The supplier will be expected to: • Propose the most appropriate interim server solution (hardware, configuration, and licensing) that meets St Basils' 1-3 year needs. • Balance resilience and performance with cost-effectiveness, recognising this is not a permanent, large-scale data centre investment. • Ensure the solution can reliably host premises-managed applications such as QL housing management and other dependent SQL-based systems. • Include options for limited resilience (e.g., RAID storage, dual power, or simplified HA if cost-effective). • Provide all required operating system and database licences. • Deliver, install, and configure to industry best practice (performance, resilience, and security). • Provide knowledge transfer and documentation to the St Basils ICT team. • Offer 3- to 5-year support and maintenance, recognising hardware may be retired earlier. Reference Systems The interim server must support and/or integrate with St Basils current applications and core systems. Key Requirements Suppliers should explain how their solution will: • Performance: Run current workloads reliably for 1-3 years. • Resilience: Provide core redundancy (power, RAID storage) but without over-investment in complex clustering. • Security: Include TPM 2.0, encryption, secure boot, and baseline hardening (Desirable). • Networking: Work with current infrastructure (1/10 Gb copper switching). • Backup/DR: Integrate with Datto/Veeam, support immutable offsite copies (cloud or equivalent). • Compliance: Support GDPR, Cyber Essentials Plus, and ISO27001/27002 alignment. • Support: Provide warranty/support cover even if hardware is retired early. • Sustainability: Be energy efficient and align with St Basil's' Net Zero and sustainability strategy. Deliverables • Fully commissioned and documented interim server solution. • Licensing, warranty, and support agreements. • Handover to ICT staff with training/knowledge transfer. • Backup/restore test to evidence capability. Supplier Response Suppliers should include: • Proposed interim solution and rationale (with options, if available). • How the design balances performance, resilience, and cost for a 1-3 year horizon. • Implementation plan and timescales. • Total cost of ownership (hardware, software, licensing, support). • Warranty/support proposals that allow early retirement. • Evidence of similar work with housing associations/charities. • Social value commitments Implementation & Costing Requirements The supplier must ensure that their tendered price is fully inclusive of all costs required to deliver a fully operational server environment. This includes, but is not limited to: • Supply, delivery, and installation of all hardware and components. • Installation and configuration of all required software, licences, and security features. • Loading of existing backups/data into the new environment. • Testing to confirm full restoration of services, including user acceptance testing (UAT) with St Basils ICT team. • Verification that all core applications and integrations (see Section 4) are operating correctly. • Provision and configuration of any required network cabling, racks, rails, or accessories. • All engineer and professional services costs (installation, testing, documentation, knowledge transfer). • All travel, subsistence, and associated expenses. No additional or hidden costs will be accepted. The final tendered price must cover a turnkey delivery resulting in a live, resilient, and fully operational environment.

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Metal, Power Generation (CCGT), Telecommunications, Data Center

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender