PROVISION OF RENEWABLE ENERGY MIX POWER SUPPLY IN AAIA, MOGADISHU
The scope, dates and status of this tender. A free account opens every field.
Source: United Nations Global Marketplace (UNGM)
PROVISION OF RENEWABLE ENERGY MIX POWER SUPPLY IN AAIA
-
The United Nations Support Office in Somalia (UNSOS) intends to procure a reliable electricity supply with a minimum verified renewable energy share of 25% from the Commercial Operation Date (COD) and which will be increased over the period within contract span within Aden Abdulle International Airport (AAIA), Mogadishu, Somalia.
-
UNSO
- Status
- Bidding
- Sector
- Power Generation (CCGT), Airport, Solar, Commercial, Residential
- Location
- Somalia
- Updated
- 3 Nov 2026
- Source
- United Nations Global Marketplace (UNGM)
ConstructChat
Ask ConstructChat about PROVISION OF RENEWABLE ENERGY MIX POWER SUPPLY IN AAIA, MOGADISHU
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | PROVISION OF RENEWABLE ENERGY MIX POWER SUPPLY IN AAIA 1. The United Nations Support Office in Somalia (UNSOS) intends to procure a reliable electricity supply with a minimum verified renewable energy share of 25% from the Commercial Operation Date (COD) and which will be increased over the period within contract span within Aden Abdulle International Airport (AAIA), Mogadishu, Somalia. 2. UNSOS will engage contractor(s) through electricity supply contract(s) for the provision of power supply. This procurement does not include the construction of a turnkey power generation plant, solar PV system, or distribution network. The contractor(s) shall supply electricity from their existing generation facilities to the UNSOS distribution infrastructure and shall be responsible only for the required interconnection works up to the agreed UNSOS connection points. 3. The initial power supply locations are given below and those locations are within AAIA, Mogadishu, Somalia: • MOVCON • Transport Section • Halane 4. UNSOS intends to engage licensed and qualified energy service provider(s) to supply constant and reliable electrical energy on a twenty-four (24) hour, seven (7) days per week basis to three (3) UNSOS powerhouses/sub-distribution grids within AAIA and conclude contract(s) for supply of energy mix. The contract will be awarded for an initial period of one (1) year, with four (4) optional one-year extensions (1+1+1+1) subject to satisfactory performance and operational requirements. 5. The detailed scope of work will be included in the solicitation documents, which are expected to be issued in due time. Specific Requirements/Information The vendor must be registred in UNGM Level-2 by the time of award. |
Original sector | Power Generation and Distribution Machinery and Accessories |
Location
Country | Somalia |
Source
Source | United Nations Global Marketplace (UNGM) |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Airport, Solar, Commercial, Residential |
Article published date | 2026-06-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
