PSW Markersbach
One of 10,000+ tenders Taiyo tracks in Germany.
Source: TED Europa
Sehr geehrter Damen und Herren,
wir stehen vor einem großen und herausfordernden Projekt:
Titel „Ersatz NS-/MS-Schaltanlagen inkl. EBT´s (Eigenbedarfstransformatoren)“
Adresse Vattenfall Wasserkraft GmbH Pumpspeicherkraftwerk Markersbach Oberbeckenstraße 8 08352 Markersbach 50.516926, 12.880391
Pumpspeicherkraftwerk Markersbach Das Pumpspeicherkraftwerk Markersbach im sächsischen Erzgebir
- Status
- Prospective
- Sector
- Hydro, Power Transmission, Power Generation (CCGT)
- Location
- Markersbach, Germany
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about PSW Markersbach
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | prior information notice |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Sehr geehrter Damen und Herren, wir stehen vor einem großen und herausfordernden Projekt: Titel „Ersatz NS-/MS-Schaltanlagen inkl. EBT´s (Eigenbedarfstransformatoren)“ Adresse Vattenfall Wasserkraft GmbH Pumpspeicherkraftwerk Markersbach Oberbeckenstraße 8 08352 Markersbach 50.516926, 12.880391 Pumpspeicherkraftwerk Markersbach Das Pumpspeicherkraftwerk Markersbach im sächsischen Erzgebirge wurde 1979 in Betrieb genommen und wird von der Vattenfall Wasserkraft GmbH betrieben. Mit sechs Maschinensätzen a 175 MWe erreicht die Anlage eine Gesamtleistung von rund 1.050 MWe und zählt damit zu den größten Pumpspeicherkraftwerken Deutschlands. Maßnahme Im Pumpspeicherkraftwerk Markersbach sollen zwischen 2028 und 2037 sämtliche 0,4-kV-Niederspannungs- sowie 10-kV- und 15,75-kV-Hochspannungsschaltanlagen erneuert werden. Der Schwerpunkt liegt zunächst auf den Schaltanlagen des allgemeinen Eigenbedarfs, deren Austausch für den Zeitraum 2028 bis 2031 vorgesehen ist. Die Schaltanlagen für maschinenrelevante Verbraucher werden schrittweise bis 2037 ersetzt. Der Altbestand des allgemeinen Eigenbedarfs umfasst 115 0,4-kV-Felder (verteilt auf 12 Schaltanlagen), 58 10-kV-Felder (2 Schaltanlagen) sowie 22 10/0,4-kV-Eigenbedarfstransformatoren mit Leistungen zwischen 250 und 1 000 kVA. Der Altbestand der maschinenrelevanten Verbraucher je Pumpspeichersatz besteht aus 6 0,4-kV-Feldern, 3 15,75-kV-Feldern und einem 10/0,4-kV-Eigenbedarfstransformator mit 400 kVA. Bitte teilen Sie uns einige Ihrer Referenzprojekte mit vergleichbarem Umfang und Leistungsparametern aus den letzten 10 Jahren mit. English Version: Dear Sir or Madam, We are facing a large and challenging project: Title “Replacement of NS/MS switchgear including EBTs (Transformers for own use) ” Address Vattenfall Wasserkraft GmbH Markersbach Pumped Storage Power Plant Oberbeckenstraße 8 08352 Markersbach 50.516926, 12.880391 Markersbach pumped storage power plant The Markersbach pumped storage power plant in the Ore Mountains in Saxony was commissioned in 1979 and is operated by Vattenfall Wasserkraft GmbH. With six machine sets of 175 MWe each, the plant has a total output of around 1,050 MWe, making it one of the largest pumped storage power plants in Germany. Measures Between 2028 and 2037, all 0.4 kV low-voltage and 10 kV and 15.75 kV high-voltage switchgear at the Markersbach pumped storage power plant is to be replaced. The initial focus will be on the switchgear for general internal consumption, which is scheduled to be replaced between 2028 and 2031. The switchgear for machine-related consumers will be replaced in stages by 2037. The old stock for general internal use comprises 115 0.4 kV fields (distributed across 12 switchgear systems), 58 10 kV fields (2 switchgear systems) and 22 10/0.4 kV internal use transformers with outputs between 250 and 1,000 kVA. The old stock of machine-related consumers per pumped storage set consists of 6 0.4 kV fields, 3 15.75 kV fields, and one 10/0.4 kV auxiliary transformer with 400 kVA. Wir freuen uns auf Ihre Rückmeldung! We look forward to hearing from you! Freundliche Grüße Kind regards Bernd Zimmermann bernd.zimmermann@vattenfall.de |
Original sector | Construction work, Construction work, Electrical machinery, apparatus, equipment and consumables; lighting |
Location
Country | Germany |
City | Markersbach |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Hydro, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in Germany
- HWSM Schwarze Pockau in Pockau - Los 8.2 & Straßenbau/ HWSM Schwarze Pockau in Pockau - Lot 8.2 & Road Construction
- Planung bis Genehmigung
- Neubau / Erweiterung Kanuzentrum, Luftschiffhafen Potsdam 14471 Potsdam - Planungsleistung der Technischen Gebäudeausrüstung
- VisRegGeo - LOS 2 - API-Gateway
- Ulster, Räsa und Unterbreizbach, Hochwasserschutz - Objektplanung
- Stadtwerke Bad Homburg v. d. Höhe - Vergabeverfahren zur Lieferung und Montage von Umwälzpumpen für das Seedammbad
- Reaktivierung von Hafensondergebietsflächen im Industriehafen durch ganzjährige vollschiffige Anbindung an den Mittellandkanal Maßnahmenkomplex 2a - Los 1 - Kampfmitteluntersuchung, -sondierung, Los 2 - Errichtung Kaianlagen, Rückbauarbeiten, Gründungs- und Bohrarbeiten, Schlickbaggerung, Gleisquerung, Oberflächenentwässerung, Asphaltarbeiten, Los 3 - Elektroinstallationsarbeiten
- Reaktivierung von Hafensondergebietsflächen im Industriehafen durch ganzjährige vollschiffige Anbindung an den Mittellandkanal Maßnahmenkomplex 2a - Los 1 - Kampfmitteluntersuchung, -sondierung, Los 2 - Errichtung Kaianlagen, Rückbauarbeiten, Gründungs- und Bohrarbeiten, Schlickbaggerung, Gleisquerung, Oberflächenentwässerung, Asphaltarbeiten, Los 3 - Elektroinstallationsarbeiten
