logo

PTDC Air Conditioning Ductwork Replacement

Sector: Metal • Location: Florida, United States of America

Source: Florida Purchasing Group

Tender
Closed

The contractor shall furnish all labor , materials , tools , equipment , permits , transportation , supervision , debris removal , and any additional resources necessary to complete the duct replacement project in accordance with county standards , building codes , and safety requirements . 3 . Detailed Work Requirements 3 . 1 Pre

Status
Closed
Sector
Metal, Commercial, Residential
Location
Florida, United States of America
Updated
3 Nov 2026
Source
Florida Purchasing Group

ConstructChat

Ask ConstructChat about PTDC Air Conditioning Ductwork Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “PTDC Air Conditioning Ductwork Replacement” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to Florida, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The contractor shall furnish all labor , materials , tools , equipment , permits , transportation , supervision , debris removal , and any additional resources necessary to complete the duct replacement project in accordance with county standards , building codes , and safety requirements . 3 . Detailed Work Requirements 3 . 1 Pre Construction Activities • Conduct a site walkthrough with County representatives to verify existing conditions . • Review existing HVAC drawings , duct layouts , and mechanical plans ( if available ). • Prepare shop drawings , installation plans , and a phased work schedule for approval . • Coordinate all work windows , access routes , material staging areas , and inmate safety protocols with facility staff . • Obtain all required permits and approvals . 3 . 2 Ductwork Removal • Remove existing duct systems on the 3rd – 6th floors , including supply , return , and exhaust ducts as identified in the project scope . • Protect existing equipment , structural components , and facility finishes during removal . • Implement dust control and debris containment measures appropriate for a secure correctional environment . • Collect and dispose of all debris in compliance with County regulations . 3 . 3 Installation of New Duct System • Install new sheet metal ductwork , insulation , hangers , supports , access panels , and all associated components according to approved plans . • Ensure all materials meet Florida Building Code , mechanical code , fire rating requirements , and correctional facility standards . • Provide proper sealing of ducts to meet or exceed current energy and air leakage standards . • Install fire dampers , smoke dampers , and access doors where required . • Coordinate tie ins to existing HVAC equipment and any required temporary air handling solutions . 3 . 4 System Integration and Testing • Perform duct leakage testing , airflow balancing , and performance verification . • Ensure all supply and return air pathways are functioning according to design specifications . • Conduct inspections with County representatives at key milestones . • Provide copies of test reports , as built drawings , and maintenance documentation . 4 . Operational Requirements • The Pretrial Detention Center is a fully operational , multi level correctional facility . Work must be phased and sequenced to prevent disruptions to daily operations , inmate management activities , and security procedures . • Construction may occur sequentially across floors ; however , access and work hours must be coordinated daily with facility leadership . • Contractors and subcontractors must comply with all security screening procedures , including ID checks , escorted movement , and tool control policies . 5 . Safety and Compliance • Adhere to OSHA standards , Florida Building Code , NFPA requirements , and all County safety regulations . • Maintain clear egress routes , fire safety systems , and ventilation standards during construction . • Ensure all workers always follow correctional facility safety protocols . 6 . Project Close Out • Complete final inspections with County staff and AHJ ( Authority Having Jurisdiction ). • Provide all close out documents , including warranties , equipment literature , testing reports , and as built drawings . • Remove all remaining materials , waste , and temporary protections from the site . • Turn over the fully operational duct system in clean , tested , and compliant condition .

Location

Country

United States of America (USA)

State

Florida

Source

Source

Florida Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Commercial, Residential

Article published date

2026-05-09

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender