PTDC Air Conditioning Ductwork Replacement
Sector: Metal • Location: Florida, United States of America
Source: Florida Purchasing Group
The contractor shall furnish all labor , materials , tools , equipment , permits , transportation , supervision , debris removal , and any additional resources necessary to complete the duct replacement project in accordance with county standards , building codes , and safety requirements . 3 . Detailed Work Requirements 3 . 1 Pre
- Status
- Closed
- Sector
- Metal, Commercial, Residential
- Location
- Florida, United States of America
- Updated
- 3 Nov 2026
- Source
- Florida Purchasing Group
ConstructChat
Ask ConstructChat about PTDC Air Conditioning Ductwork Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The contractor shall furnish all labor , materials , tools , equipment , permits , transportation , supervision , debris removal , and any additional resources necessary to complete the duct replacement project in accordance with county standards , building codes , and safety requirements . 3 . Detailed Work Requirements 3 . 1 Pre Construction Activities • Conduct a site walkthrough with County representatives to verify existing conditions . • Review existing HVAC drawings , duct layouts , and mechanical plans ( if available ). • Prepare shop drawings , installation plans , and a phased work schedule for approval . • Coordinate all work windows , access routes , material staging areas , and inmate safety protocols with facility staff . • Obtain all required permits and approvals . 3 . 2 Ductwork Removal • Remove existing duct systems on the 3rd – 6th floors , including supply , return , and exhaust ducts as identified in the project scope . • Protect existing equipment , structural components , and facility finishes during removal . • Implement dust control and debris containment measures appropriate for a secure correctional environment . • Collect and dispose of all debris in compliance with County regulations . 3 . 3 Installation of New Duct System • Install new sheet metal ductwork , insulation , hangers , supports , access panels , and all associated components according to approved plans . • Ensure all materials meet Florida Building Code , mechanical code , fire rating requirements , and correctional facility standards . • Provide proper sealing of ducts to meet or exceed current energy and air leakage standards . • Install fire dampers , smoke dampers , and access doors where required . • Coordinate tie ins to existing HVAC equipment and any required temporary air handling solutions . 3 . 4 System Integration and Testing • Perform duct leakage testing , airflow balancing , and performance verification . • Ensure all supply and return air pathways are functioning according to design specifications . • Conduct inspections with County representatives at key milestones . • Provide copies of test reports , as built drawings , and maintenance documentation . 4 . Operational Requirements • The Pretrial Detention Center is a fully operational , multi level correctional facility . Work must be phased and sequenced to prevent disruptions to daily operations , inmate management activities , and security procedures . • Construction may occur sequentially across floors ; however , access and work hours must be coordinated daily with facility leadership . • Contractors and subcontractors must comply with all security screening procedures , including ID checks , escorted movement , and tool control policies . 5 . Safety and Compliance • Adhere to OSHA standards , Florida Building Code , NFPA requirements , and all County safety regulations . • Maintain clear egress routes , fire safety systems , and ventilation standards during construction . • Ensure all workers always follow correctional facility safety protocols . 6 . Project Close Out • Complete final inspections with County staff and AHJ ( Authority Having Jurisdiction ). • Provide all close out documents , including warranties , equipment literature , testing reports , and as built drawings . • Remove all remaining materials , waste , and temporary protections from the site . • Turn over the fully operational duct system in clean , tested , and compliant condition . |
Location
Country | United States of America (USA) |
State | Florida |
Source
Source | Florida Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Commercial, Residential |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
