Public Safety Complex Feasibility Study
Sector: Water Supply and Storage • Location: Utah, United States of America
Source: Utah Purchasing Group
The selected consultant shall perform the following tasks as part of the Feasibility Study . All work products must be in a format suitable for public review and Commission decision - making . Task 1 : Site Assessment and Feasibility 1 . 1 Site Identification and Evaluation The consultant shall identify two to
- Status
- Closed
- Sector
- Water Supply and Storage, Natural Gas, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Commercial, Automotive, Power Transmission, Residential, Road
- Location
- Utah, United States of America
- Updated
- 3 Nov 2026
- Source
- Utah Purchasing Group
ConstructChat
Ask ConstructChat about Public Safety Complex Feasibility Study
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The selected consultant shall perform the following tasks as part of the Feasibility Study . All work products must be in a format suitable for public review and Commission decision - making . Task 1 : Site Assessment and Feasibility 1 . 1 Site Identification and Evaluation The consultant shall identify two to four viable sites , with the current Grand County complex as the priority site . Each site shall be evaluated against the following minimum criteria : • Access to utilities ( water , sewer , power , natural gas ), including capacity confirmation from service providers • Adequate road access and traffic capacity • Zoning compliance or feasibility of zoning change • Topography and geotechnical suitability • Environmental constraints • Expansion potential for future growth ( minimum 30 - year horizon ) • Infrastructure capacity to support expanded inmate population ( e . g ., sewer and water capacity for up to 200 inmates ) 1 . 2 Site Development Analysis For each site , the consultant shall provide : • Preliminary geotechnical assessment ( desktop analysis , existing data review ; field investigation if warranted ) • Utility capacity confirmation from service providers • Traffic impact preliminary assessment • Quantified site development costs including grading and earthwork , utility extensions and connections , access roads and parking , stormwater management , and other necessary site improvements 1 . 3 Deliverables • Site evaluation matrix ranking sites by suitability and cost • Recommended primary and alternate sites with justification Task 2 : Facility Programming and Cost Estimation 2 . 1 Facility Programming The consultant shall confirm space requirements through coordination with County stakeholders , including : • Sheriff ’ s Department operational needs ( including space for GCSO , Moab City Police , Utah Highway Patrol , Search and Rescue ) • Jail capacity requirements : current operations ( approximately 43 inmates in a 60 - bed facility ) and 20 - to 30 - year projections targeting approximately 100 beds with expansion potential • Rehabilitative and educational programming spaces ( substance abuse treatment , sex offender treatment , domestic violence programs , mental health counseling , educational classrooms , vocational training , life skills and job readiness , family visitation , re - entry planning , and general multipurpose programming rooms ) • County Attorney office space • Courthouse and court services space ( coordination with Utah Courts required ) • Evidence storage and processing • Support spaces ( sally port , intake , booking , training , multipurpose areas ) The consultant shall develop a preliminary space allocation by department and function , and provide a total gross square footage estimate including circulation , mechanical , and structural space . Facility design should consider modern “ pod type ” jail configurations that maximize staffing efficiency . |
Location
Country | United States of America (USA) |
State | Utah |
Source
Source | Utah Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Natural Gas, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Commercial, Automotive, Power Transmission, Residential, Road |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
