logo

Public Safety Complex Feasibility Study

Sector: Water Supply and Storage • Location: Utah, United States of America

Source: Utah Purchasing Group

Tender
Closed

The selected consultant shall perform the following tasks as part of the Feasibility Study . All work products must be in a format suitable for public review and Commission decision - making . Task 1 : Site Assessment and Feasibility 1 . 1 Site Identification and Evaluation The consultant shall identify two to

Status
Closed
Sector
Water Supply and Storage, Natural Gas, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Commercial, Automotive, Power Transmission, Residential, Road
Location
Utah, United States of America
Updated
3 Nov 2026
Source
Utah Purchasing Group

ConstructChat

Ask ConstructChat about Public Safety Complex Feasibility Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Public Safety Complex Feasibility Study” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Utah, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The selected consultant shall perform the following tasks as part of the Feasibility Study . All work products must be in a format suitable for public review and Commission decision - making . Task 1 : Site Assessment and Feasibility 1 . 1 Site Identification and Evaluation The consultant shall identify two to four viable sites , with the current Grand County complex as the priority site . Each site shall be evaluated against the following minimum criteria : • Access to utilities ( water , sewer , power , natural gas ), including capacity confirmation from service providers • Adequate road access and traffic capacity • Zoning compliance or feasibility of zoning change • Topography and geotechnical suitability • Environmental constraints • Expansion potential for future growth ( minimum 30 - year horizon ) • Infrastructure capacity to support expanded inmate population ( e . g ., sewer and water capacity for up to 200 inmates ) 1 . 2 Site Development Analysis For each site , the consultant shall provide : • Preliminary geotechnical assessment ( desktop analysis , existing data review ; field investigation if warranted ) • Utility capacity confirmation from service providers • Traffic impact preliminary assessment • Quantified site development costs including grading and earthwork , utility extensions and connections , access roads and parking , stormwater management , and other necessary site improvements 1 . 3 Deliverables • Site evaluation matrix ranking sites by suitability and cost • Recommended primary and alternate sites with justification Task 2 : Facility Programming and Cost Estimation 2 . 1 Facility Programming The consultant shall confirm space requirements through coordination with County stakeholders , including : • Sheriff ’ s Department operational needs ( including space for GCSO , Moab City Police , Utah Highway Patrol , Search and Rescue ) • Jail capacity requirements : current operations ( approximately 43 inmates in a 60 - bed facility ) and 20 - to 30 - year projections targeting approximately 100 beds with expansion potential • Rehabilitative and educational programming spaces ( substance abuse treatment , sex offender treatment , domestic violence programs , mental health counseling , educational classrooms , vocational training , life skills and job readiness , family visitation , re - entry planning , and general multipurpose programming rooms ) • County Attorney office space • Courthouse and court services space ( coordination with Utah Courts required ) • Evidence storage and processing • Support spaces ( sally port , intake , booking , training , multipurpose areas ) The consultant shall develop a preliminary space allocation by department and function , and provide a total gross square footage estimate including circulation , mechanical , and structural space . Facility design should consider modern “ pod type ” jail configurations that maximize staffing efficiency .

Location

Country

United States of America (USA)

State

Utah

Source

Source

Utah Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Natural Gas, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Commercial, Automotive, Power Transmission, Residential, Road

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender