logo

Public tender offshore wind PPA

The scope, dates and status of this tender. A free account opens every field.

Source: TED Europa

Tender
Contract Notice

Gasunie aims to achieve 40% Carbon Free Energy (CFE) in 2030. To realize this, Gasunie intends to contract a PPA from a new to built offshore wind farm with a duration of 10 years.

The contract shall start on 1-1-2029 or 1-1-2030. The contracted capacity constitutes 40 MW for the full duration. There are two mutual options included to ensure goal realization:

  1. Mutual option for EemsEnergyTermi
Status
Closed
Sector
Wind, Oil and Gas, Raw Materials, Power Generation (CCGT)
Location
Netherlands
Updated
3 Nov 2026
Source
TED Europa

ConstructChat

Ask ConstructChat about Public tender offshore wind PPA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Public tender offshore wind PPA” is a tender record in Taiyo, linked to the Wind sector. It is issued for works, goods, or services related to Netherlands.

Participants

Not available for this record.

Status

Original status

contract notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Gasunie aims to achieve 40% Carbon Free Energy (CFE) in 2030. To realize this, Gasunie intends to contract a PPA from a new to built offshore wind farm with a duration of 10 years. The contract shall start on 1-1-2029 or 1-1-2030. The contracted capacity constitutes 40 MW for the full duration. There are two mutual options included to ensure goal realization: 1. Mutual option for EemsEnergyTerminal when FID is taken - 10 MW from 1-1-2029/30 till 2036 with the possibility to be extended till the end of the contract term. 2. Mutual option to facilitate minor portfolio increases: maximum of 10 MW to be mutually agreed upon during the contract term with a duration of at least one year The electricity shall be physcially delivered to Gasunie including the associated and traceable GoO's. For more information about the procedure, contract and how to receive the tender documents please refer to Ariba. 1-1-2029/30 - 2038/39: 40 MW 1-1-2029/30 - 2036: mutual option of 10 MW for EET During the contract term a maximum of 10 MW may be included based on mutual agreement

Original sector

Petroleum products, fuel, electricity and other sources of energy

Location

Country

Netherlands

Source

Source

TED Europa

URL

More Details

Record type

Tender

Sector

Wind, Oil and Gas, Raw Materials, Power Generation (CCGT)

Article published date

2026-07-24

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender