Public tender offshore wind PPA
The scope, dates and status of this tender. A free account opens every field.
Source: TED Europa
Gasunie aims to achieve 40% Carbon Free Energy (CFE) in 2030. To realize this, Gasunie intends to contract a PPA from a new to built offshore wind farm with a duration of 10 years.
The contract shall start on 1-1-2029 or 1-1-2030. The contracted capacity constitutes 40 MW for the full duration. There are two mutual options included to ensure goal realization:
- Mutual option for EemsEnergyTermi
- Status
- Closed
- Sector
- Wind, Oil and Gas, Raw Materials, Power Generation (CCGT)
- Location
- Netherlands
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Public tender offshore wind PPA
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Gasunie aims to achieve 40% Carbon Free Energy (CFE) in 2030. To realize this, Gasunie intends to contract a PPA from a new to built offshore wind farm with a duration of 10 years. The contract shall start on 1-1-2029 or 1-1-2030. The contracted capacity constitutes 40 MW for the full duration. There are two mutual options included to ensure goal realization: 1. Mutual option for EemsEnergyTerminal when FID is taken - 10 MW from 1-1-2029/30 till 2036 with the possibility to be extended till the end of the contract term. 2. Mutual option to facilitate minor portfolio increases: maximum of 10 MW to be mutually agreed upon during the contract term with a duration of at least one year The electricity shall be physcially delivered to Gasunie including the associated and traceable GoO's. For more information about the procedure, contract and how to receive the tender documents please refer to Ariba. 1-1-2029/30 - 2038/39: 40 MW 1-1-2029/30 - 2036: mutual option of 10 MW for EET During the contract term a maximum of 10 MW may be included based on mutual agreement |
Original sector | Petroleum products, fuel, electricity and other sources of energy |
Location
Country | Netherlands |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Wind, Oil and Gas, Raw Materials, Power Generation (CCGT) |
Article published date | 2026-07-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Wind tenders in Netherlands
- Database containing information on renewable energy
- Sportpaleis
- English editor Dutch Offshore Wind
- Landschapsbureau buitenruimte Rijnpark
- Duurzame elektriciteit NPO/NOS
- Expert support: Cost effectiveness and business case analyses for future offshore wind farm sites
- TenneT - Grid Field Operation Offshore Netherlands (GON) - Crew Transfer Vessel (CTV) Services 2026 - 2028
- Raamovereenkomst Softshells
