Pump Station Inspection Maintenance & Repair Statewide
Sector: Manufacturing (Industrial) • Location: MITN, United States of America
Source: MITN Purchasing Group
The Contractor will be responsible for providing as - needed maintenance or repair services for pumps and motors . Pump and motor services include , but may not be limited to , removing ( if needed ) pump or motor for servicing ; inspecting , testing , and diagnosing units ; general maintenance and reporting ; repairing
- Status
- Closed
- Sector
- Manufacturing (Industrial)
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Pump Station Inspection Maintenance & Repair Statewide
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor will be responsible for providing as - needed maintenance or repair services for pumps and motors . Pump and motor services include , but may not be limited to , removing ( if needed ) pump or motor for servicing ; inspecting , testing , and diagnosing units ; general maintenance and reporting ; repairing , refurbishing / rebuilding , or replacing components ; and reinstalling serviced pumps or motors . The Contractor will follow the Specifications included in this Contract as well as the instructions of the MDOT representatives Statewide . See Attachment 1 - Specification - Pump Inspection , Maintenance or Repair and Attachment 2 - Specification - Refurbishing Motors for additional requirements and scope . Service Specifications All Contract Activities must be completed in accordance with the current standards and practices of the NEC , ANSI , the current MDOT Standard Specifications for Construction ( see MDOT 2020 Standard Specifications for Construction [ WEB ]- linked ), MIOSHA , industry standards and applicable codes , and the special provisions herein . The Contractor is responsible for ensuring their staff maintain all necessary licenses which relate to the work activities preformed under this contract . The Contractor must be licensed as an Electrical Contractor with State of Michigan Department of Licensing and Regulatory Affairs ( LARA ). All electrical services provided at the pump station sites must be performed by a Master Electrician , licensed with LARA ; or by an Electrical Journeyman , licensed with LARA , under the supervision of a licensed Master Electrician . All electrical work must be done in accordance with the NEC . The Contractor must provide a copy of their Electrical Contractor license and all electricians ’ licenses to the Engineer , Program Manager , or designee at the time of contract award . The Contractor must secure all permits and inspections required by the state of Michigan for electrical services rendered at pump station locations . The Contractor must provide copies of permit and inspection reports to the program manager with the invoice submittal . Preferably , the Contractor should have an established factory authorized service and repair facility within the State Of Michigan . The Contractor will be responsible for the cost and replacement of any damage as a result of performing contract activities . The Contractor is directly and solely responsible for disposal of surplus and unsuitable material as stated within the currently published MDOT Standard Specifications for Construction , 205 . 03 . P . 2 1 . 1 . 2 Work Requests The MDOT Program Manager will determine if or when services are needed and will contact the Contractor with the site location , and general description of issues . Once the pump or motor is pulled the Contractor must provide an estimate which include the site location , complete diagnosis , approximate time needed to complete the work and a list of pay items required to complete the repairs . MDOT Program Manager or designee will review the estimate and provide an email with approval for the repairs to proceed . 1 . 1 . 3 Measurement and Payment The completed work , as described , will be measured and paid for at the contract unit price using the following pay items : Pay Item Pay Unit Crane Mobilization ………………………………………...………………. Each Pump Inspection , Reporting , and General Maintenance .......... Each Enclosing Tube .................................................................... Each Enclosing Tube Bearings ......................................................... Each Pump Shaft .............................................................................. Each Intermediate Shaft .................................................................... Each Head Shaft ............................................................................... Each Lines Shaft Coupling ................................................................. Each Impeller .................................................................................... Each Impeller Repair ......................................................................... Each Bowl Assembly ......................................................................... Each Bowl Assembly Repair .............................................................. Each Column ...................................................................................... Foot |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Manufacturing (Industrial) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Manufacturing (Industrial) tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Sole Source for a Hand Held Video Receiver System
- Security Hardware Services
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- PreQualification of Bidders for Chaboya Improvements
- Alonzo Babe James Community Center Playground Artificial Turf
- Prefabricated Manufactured Structures as Living Quarters for County Fire Personnel
