Purchase Items Container for gas turbine engine 1 unit
One of 2,256 tenders Taiyo tracks in Tokyo.
Source: Japan External Trade Organization (JETRO)
Summary (1) Nature and Quantity Purchase Items Container for gas turbine engine unit (2) Location of Work or Location of Implementation Sunamachi Water Reclamation Center, 9- Shinsuna 3-chome, Koto-ku, Tokyo (3) Work Period or Implementation Period December 1 (Friday), 202 (4) Language and currency used in the contracting procedure The language and currency used in the contracting procedure shall
- Status
- Prospective
- Sector
- Wind, Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Tokyo, Japan
- Updated
- 3 Nov 2026
- Source
- Japan External Trade Organization (JETRO)
ConstructChat
Ask ConstructChat about Purchase Items Container for gas turbine engine 1 unit
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | prospective |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Summary (1) Nature and Quantity Purchase Items Container for gas turbine engine unit (2) Location of Work or Location of Implementation Sunamachi Water Reclamation Center, 9- Shinsuna 3-chome, Koto-ku, Tokyo (3) Work Period or Implementation Period December 1 (Friday), 202 (4) Language and currency used in the contracting procedure The language and currency used in the contracting procedure shall be Japanese and Japanese currency. (5) Time Limit of Tender by electroni bidding 5:0 p.m. on July (Wednesday), 202 (6) Inquiry Section regarding Notice of Tender Contracting Section, Accounting and Contracting Division, Bureau of Sewerage E-mail: S4000013@section.metro.tokyo.jp |
Location
Country | Japan |
State | Tokyo |
Source
Source | Japan External Trade Organization (JETRO) |
URL |
More Details
Record type | Tender |
Sector | Wind, Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2026-05-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Wind tenders in Japan
- Desc2103C - Bulk Fuel Storage Tanks Phase Ii Yokota Air Base, Japan
- Satomi Power Station: Purchasing water turbine, generator etc.
- Oem Kingsbury Inc - Thrust Bearing Assembly Parts
- Gas Turbine Generator (Gtg) High Pressure (Hp) Air Start Reducing Manifold
- a unit price per liter: Aviation Turbine Fuel (JIS 1) 550,000 liters
- Light Oil (Tax, Exemption), (Mizu- shima Port) About 282KL,and 12 other contracts
- Fuel Oil A (Nagoya Port, Apr.-Mar.) About 2,600,000L,and 13 other contracts
- Wind Turbine Testing and Measurement System 1 Set
