PW - Ductile Iron Gravity Sewer Pipe
Sector: Waste Processing and Treatment • Location: Minnesota, United States of America
Source: Minnesota Purchasing Group
This specificaƟon describes the requirements for bidding to supply DucƟle Iron Pipe ( DIP ) and related items for the 2026 construcƟon season . All supplied pipe and related items will be suitable for use as , direct burial , storm and sanitary sewer lines . Sec . 1 . 02 Storm Sewer : All DucƟle Iron Gravity Se
- Status
- Closed
- Sector
- Waste Processing and Treatment, Metal, Water Supply and Storage, Manufacturing (Industrial)
- Location
- Minnesota, United States of America
- Updated
- 3 Nov 2026
- Source
- Minnesota Purchasing Group
ConstructChat
Ask ConstructChat about PW - Ductile Iron Gravity Sewer Pipe
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This specificaƟon describes the requirements for bidding to supply DucƟle Iron Pipe ( DIP ) and related items for the 2026 construcƟon season . All supplied pipe and related items will be suitable for use as , direct burial , storm and sanitary sewer lines . Sec . 1 . 02 Storm Sewer : All DucƟle Iron Gravity Sewer Pipe – Iron Class CL52 Slip on joints pipes will meet : ASTM A746 standard for DucƟle Iron Gravity Sewer Pipe ANSI C150 and ANSI C151 for pressure classes ANSI C104 for Cement Lining . Sec . 1 . 03 Sanitary Sewer : The Standard of Quality is Protecto 401 Ceramic Epoxy . The material shall be an amine cured novalac epoxy containing at least 20 % by volume of ceramic quartz pigment . Any request for subsƟtuƟon must be accompanied by a successful history of lining pipe and fiƫngs for sewer service , a test report verifying the following properƟes , and a cerƟficaƟon of the test results . A . A permeability raƟng of 0 . 00 when tested according to Method A of ASTM E - 96 , Procedure A with a test duraƟon of 30 days . B . The following test must be run on coupons from factory lined ducƟle iron pipe : ASTM B - 117 Salt Spray ( scribed panel ) – Results to equal 0 . 0 undercuƫng aŌer two years . ASTM G - 95 Cathodic Disbondment 1 . 5 volts @ 77 ° F . Results to equal no more than 0 . 5 mm undercuƫng aŌer 30 days . |
Location
Country | United States of America (USA) |
State | Minnesota |
Source
Source | Minnesota Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Metal, Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
