Q4 Fy26 Baltimore Harbor And Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, Md
Solicitation · Baltimore, MD
Source: SAM.gov
The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027. The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 1,538,000 cy will b
- Status
- Prospective
- Sector
- Commercial, Seaport, Aerospace & Defense, Water Supply and Storage, Residential
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Q4 Fy26 Baltimore Harbor And Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, Md
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027. The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Commercial, Seaport, Aerospace & Defense, Water Supply and Storage, Residential |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in Baltimore, MD
- Q4 Fy26 Baltimore Harbor And Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, Md
- Q4 Fy26 Baltimore Harbor And Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, Md
- Q4 Fy26 Baltimore Harbor And Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, Md
- Q4 Fy26 Baltimore Harbor And Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, Md
- Q4 Fy26 Baltimore Harbor And Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, Md
