QQ26025 - Bushbury Sprinkler Tank Replacement
Sector: Water Supply and Storage • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
The works at Bushbury Primary School comprise the full replacement of the existing sectional fire sprinkler water storage tank to ensure the continued compliance and reliability of the school's fire suppression system. The appointed contractor is required to safely isolate and drain the existing tank, disconnect all associated mechanical and electrical services, and fully dismantle and remove the
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about QQ26025 - Bushbury Sprinkler Tank Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The works at Bushbury Primary School comprise the full replacement of the existing sectional fire sprinkler water storage tank to ensure the continued compliance and reliability of the school's fire suppression system. The appointed contractor is required to safely isolate and drain the existing tank, disconnect all associated mechanical and electrical services, and fully dismantle and remove the redundant tank from site for off site disposal in accordance with environmental regulations. A new sectional sprinkler water storage tank, manufactured by DECCA or equal and approved, is to be supplied, delivered, installed, tested, and commissioned, providing a fully operational and compliant system in line with current sprinkler and water regulations. All works must be carried out by an LPCB Red Book (LPS 1048) accredited sprinkler contractor, with full testing, commissioning, and witness testing completed prior to handover. The contractor must provide comprehensive commissioning records, certification, as built documentation, and O&M manuals before final payment. All activities are to be undertaken in compliance with CDM Regulations, safeguarding requirements due to the school environment, and site security controls throughout the works. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-07-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
