QRC-SERVICES FOR NEW MCC, SCC AND TRADING HUB
Sector: Car parking • Location: Qatar
Source: QatarEnergy
Brief Scope of Works: A brief Scope for Enabling Works and Construction of New MCC, SCC and Trading Hub are noted below: Scope for Enabling Works: The scope comprises of carrying out the Enabling Works at the Visitor’s Car Parking Building, to facilitate the construction of New MCC, SCC and Trading Hub. QatarEnergy HQ Visitor’s Car Parking Building is a 5-storey building with the gross
- Status
- Closed
- Sector
- Car parking, Cement, Automotive, Commercial
- Location
- Qatar
- Updated
- 3 Nov 2026
- Source
- QatarEnergy
ConstructChat
Ask ConstructChat about QRC-SERVICES FOR NEW MCC, SCC AND TRADING HUB
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Brief Scope of Works: A brief Scope for Enabling Works and Construction of New MCC, SCC and Trading Hub are noted below: Scope for Enabling Works: The scope comprises of carrying out the Enabling Works at the Visitor’s Car Parking Building, to facilitate the construction of New MCC, SCC and Trading Hub. QatarEnergy HQ Visitor’s Car Parking Building is a 5-storey building with the gross built-up area approximately 21,749 m². There are approximately 491 numbers of car parking in the existing visitor’s car parking building which are located from ground floor to roof level. There are 3 levels of basement parking below the footprint of this building. The existing parking building Civil, MEP, ELV/ICT works, and installed systems are complete up to the as-built condition. The scope for the Enabling Works package includes but not limited to the following: Cutting/Opening of Post Tensioned (PT) structural slabs Columns and roof slab strengthening works Demolition of existing external railing and masonry works Dismantling, removal, safe disposal and safe storage of Base-built equipment Hoarding and protection, collection and disposal of waste. The Enabling works package contractor shall carry out the PT slab modifications including PT slab cutting and strengthening by engaging QatarEnergy nominated PT specialist subcontractor. The Enabling works contractor shall: Consider the current site conditions. Carryout the site tests/investigations to confirm the material properties of the existing. Carryout the geometric survey of the existing structure to confirm it aligns with the as-built drawings structure as indicated on the as-built drawings. Carryout the visual condition survey to identify any deficiencies in the |
Original sector | INFRASTRUCTRE & CIVIL PROJECTS |
Location
Country | Qatar |
Source
Source | QatarEnergy |
URL |
More Details
Record type | Tender |
Sector | Car parking, Cement, Automotive, Commercial |
Article published date | 2026-11-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Car parking tenders in Qatar
- Providing Truck Parking & Flood Mitigation for Quarantine Veterinary at AlRuwais
- QRC-SERVICES FOR NEW MCC, SCC AND TRADING HUB
- QRC-SERVICES FOR NEW MCC, SCC AND TRADING HUB
- QRC-SERVICES FOR NEW MCC, SCC AND TRADING HUB
- QRC-SERVICES FOR NEW MCC, SCC AND TRADING HUB
- QRC-SERVICES FOR NEW MCC, SCC AND TRADING HUB
- PROVISION OF FACILITIES MANAGEMENT SERVICES (SOFT SERVICES) AT QatarEnergy HEADQUARTERS
- PROVISION OF FACILITIES MANAGEMENT SERVICES (SOFT SERVICES) AT QatarEnergy HEADQUARTERS
