logo

Quarry Raw Water Supply Project (Contract "E")

One of 10,000+ tenders Taiyo tracks in Georgia.

Tender
Under Evaluation

Sealed bids for construction of the Quarry Raw Water Supply Project (Contract "E") will be received until the closing time of April 29, 2026 @ 2:00 PM local time. Bids must be submitted by the Bidder electronically through QuestCDN.com. No paper submissions will be accepted. Any bid received after the bid closing time and date will not be considered by the Owner. No bid may be withdrawn after the

Status
Closed
Sector
Road, Forest Products and Packaging, Power Transmission, Consumer Products, Power Generation (CCGT)
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Procurement Registry

ConstructChat

Ask ConstructChat about Quarry Raw Water Supply Project (Contract "E")

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Quarry Raw Water Supply Project (Contract "E")” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Georgia, United States.

Participants

Not available for this record.

Status

Original status

under evaluation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Sealed bids for construction of the Quarry Raw Water Supply Project (Contract "E") will be received until the closing time of April 29, 2026 @ 2:00 PM local time. Bids must be submitted by the Bidder electronically through QuestCDN.com. No paper submissions will be accepted. Any bid received after the bid closing time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically provided in the Instructions to Bidders and/or by State law. Base Cost of all Bids will be posted by the Owner/Engineer to the QuestCDN website within approximately 30 minutes after the bid closing time. The Work to be completed shall consist of construction of ± 28,000 LF of 24" raw water main, complete with bores, fittings combination air valves, driveway and road replacement, grassing, erosion and sediment control measures, and all related work for a complete installation. Time allotted for completion of work will be a maximum of 335 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. (See Supporting Documents Section 5 for more information.)

Original sector

Construction / Public Works

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Procurement Registry

URL

More Details

Record type

Tender

Sector

Road, Forest Products and Packaging, Power Transmission, Consumer Products, Power Generation (CCGT)

Article published date

2026-10-22

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender