R09 Dam Early Warning System
Sector: Hydro • Location: United States of America
Source: SAM.gov
Amendment 0002 Posted 04/20/2026 Amendment 0001 Posted 04/07/2026 This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12445526Q0029 is issued as a Request for Quotation (RFQ)
- Status
- Closed
- Sector
- Hydro, Raw Materials, Commercial, Residential
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about R09 Dam Early Warning System
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Amendment 0002 Posted 04/20/2026 Amendment 0001 Posted 04/07/2026 This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12445526Q0029 is issued as a Request for Quotation (RFQ) for Region 09 Dam Early Warning System. The Hoosier, Huron-Manistee, Mark Twain, Monongahela, Shawnee, Wayne and White Mountain National Forest requires Dam Early Warning Systems. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238210 – Electrical Contractors and Other Wiring Installation Contractors. The small business size standard is $19 Million This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. The magnitude of this requirement is between $100,000 and $250,000. There is no scheduled site visit for this solicitation. Vendors are encouraged to visit the site independently. Any questions must be sent to Kevin.Brown2@usda.gov before 04/20/2026 1700 PM EST. See “Attachment 1 - Solicitation Terms and Conditions” for applicable clauses, instructions, and evaluation criteria. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Hydro, Raw Materials, Commercial, Residential |
Article published date | 2026-04-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United States of America
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Bay Corridor Transmission & Distribution - Phase 2 (2019) S...
- College Hill Reservoir Outlet Structure And Pipeline
- Bay Corridor Transmission and Distribution - Phase 3 (2019)
- Regional Groundwater Storage and Recovery
- Fillmore and Haight Street Intersection AWSS, Pavement, and ...
- REJECTED: Southeast Water Pollution Control Plant Power Feed...
- Turner Dam Spillway and Pond F3 East Erosion Repair
