R2 HQ Parking Lot Drainage Project
Sector: Road • Location: Colorado, United States of America
Source: CDOT CPCS & PROPERTY MANAGEMENT - Colorado
Background , Overview and GoalsCDOT Region 2 ( R2 ) has been experiencing some ponding in the employee parking lot after storm events . This has resulted in some icy areas in the winter resulting in some slips and falls . R2 has surveyed the parking lot in this area and has developed a storm drainage s
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Cement, Car parking, Automotive
- Location
- Colorado, United States of America
- Updated
- 3 Nov 2026
- Source
- CDOT CPCS & PROPERTY MANAGEMENT - Colorado
ConstructChat
Ask ConstructChat about R2 HQ Parking Lot Drainage Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Background , Overview and GoalsCDOT Region 2 ( R2 ) has been experiencing some ponding in the employee parking lot after storm events . This has resulted in some icy areas in the winter resulting in some slips and falls . R2 has surveyed the parking lot in this area and has developed a storm drainage system design to help eliminate this issue . The contractor shall complete all work as detailed in the R2 HQ Parking Lot Drainage Removals Plan Sheet . This shall include saw cutting to a neat vertical face areas where removal of concrete , removal of asphalt mat , and removal of curb and gutter are called out in the plans . All removal materials including but not limited to the removal of concrete , removal of asphalt mat , removal of curb and gutter , and unclassified excavation shall be disposed of by the contractor . The contractor shall remove the existing irrigation valve box and cap off all active lines until valve box can be relocated to location noted on the R2 HQ Parking Lot Drainage Plan Sheet . The contractor shall complete all work as detailed in the R2 HQ Parking Lot Drainage Plan Sheet . This shall include providing and installing all Concrete Pavement ( Class P ), Wire Mesh , Hot Mix Asphalt ( Patching ), Aggregate Base Course ( Class 6 ), Structural Backfill ( Flow - Fill ), Loose Structural Backfill ( Class 1 ), Type 13 Inlet , 15 ” Flexible HDPE pipe , and 15 ” x 15 ” x 8 ” Wye . The Contractor shall also reinstall irrigation valve box as noted on the plans . This work shall include all necessary pipes , fittings , wire , or any other products required to relocate irrigation valve box from its current location to its proposed location . This work shall be included in the cost of the work and will not be paid for separately . See more |
Location
Country | United States of America (USA) |
State | Colorado |
Source
Source | CDOT CPCS & PROPERTY MANAGEMENT - Colorado |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Cement, Car parking, Automotive |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
