Re - Roofing Saks High School Gym For The Calhoun County Board Of Education
Closed · Alabama · Last reported Apr 2026
Source: Alabama Purchasing Group
PROJECT / WORK IDENTIFICATION A . General : Project name is as indicated in the Advertisement For Bids and as shown on the Contract Documents prepared by McKee & Associates , 631 S . Hull Street Montgomery , Alabama 36104 . B . Contract Documents : Indicate the work of the Contract and related requirements and cond
- Status
- Closed
- Sector
- Education, Car parking, Commercial, Automotive, Residential, Road
- Location
- Alabama, United States of America
- Updated
- 3 Nov 2026
- Source
- Alabama Purchasing Group
ConstructChat
Ask ConstructChat about Re - Roofing Saks High School Gym For The Calhoun County Board Of Education
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | PROJECT / WORK IDENTIFICATION A . General : Project name is as indicated in the Advertisement For Bids and as shown on the Contract Documents prepared by McKee & Associates , 631 S . Hull Street Montgomery , Alabama 36104 . B . Contract Documents : Indicate the work of the Contract and related requirements and conditions that have an impact on the project . Related requirements and conditions that are indicated on the Contract Documents include , but are not limited to the following : 1 . Existing site conditions and restrictions on use of the site including ingress and egress to the site . 2 . Grading operations at the site . 3 . The Contractor shall be responsible to secure the site during the execution of the work and provide proof of insurance including but not limited to General Liability , W / C , Auto , Equipment , etc . C . Summary by References : Work of the Contract can be summarized by references to the Contract , General Conditions , Supplementary Conditions , the Project Manual , Technical Specification Sections , Drawings , Addenda and modifications to the Contract Documents issued subsequent to the initial printing of this Project Manual and the Drawings , and including but not necessarily limited to , printed material referenced by any of the above . It is recognized that the Work of the Contract is also unavoidably affected or influenced by governing regulations , natural phenomenon including weather conditions , and other forces outside the contract documents . CONTRACTOR USE OF PREMISES A . General : During the entire cleanup period the Contractor shall have the exclusive use of the premises for cleanup operations , including full use of the site as shown on the Drawings . B . Limitations of exclusive use of the site : 1 . Confine operations at the site to the areas permitted under the Contract . Portions of the site beyond areas on which work is indicated are not to be disturbed . Conform to applicable rules and regulations affecting the work while engaged in project performance . See site plan for ingress and egress to the site , or if not indicated , same shall be as designated by the Architect . 2 . Keep existing public roads , driveways and entrances serving the premises clear and available at all times . Do not use these areas for parking or storage of materials . Remove dirt , mud , debris , etc ., from site , sidewalks , streets , and public right - of - way as it occurs . 3 . Do not unreasonably encumber the site with materials or equipment . Confine stockpiling of materials and location of storage sheds and or designated storage areas as indicated . 4 . Lock automotive type vehicles , such as passenger cars and trucks and other mechanized or motorized construction equipment , when parked and unattended , so as to prevent unauthorized use . Do not leave such vehicles or equipment unattended with the motor running or the ignition key in place . 5 . The Owner , and their representatives , the Architect and their Consultants , as well as authorities having jurisdiction will require site accessibility for inspections , observations , and perhaps other purposes , related to the planned new construction . All Contractors shall assist in such accessibility , to at least the point of providing and maintaining accessible dry paths to work in progress . 6 . Furnish and install by contractor temporary barricades , fencing , etc ., as indicated or otherwise required , to restrict pedestrian and vehicular traffic from construction operations , including in part , Owner ' s staff , the public , students , children , and residents of the adjacent residential neighborhoods . 7 . Construction operations shall not affect in any manner , the on - going operations of the Owner , immediately adjacent facilities , adjacent property owners or businesses , or others . Refer to Division 1 Section " Special Conditions " for additional information and requirements regarding coordination with Owner ' s activities , etc . 8 . Construction equipment shall not come in contact with or swing over existing facilities to remain , public areas , occupied buildings , right - of - ways , etc ., which are to remain . 9 . All contractors and their employees shall limit any discussion of the Work of this project to the Owner ' s representatives named in the front of this Project Manual , Consultants employed , inspecting authorities with jurisdiction , and the Architect . In no instance shall this project be discussed with others , except as may otherwise be indicated herein . 10 . Parking on - site , if any , shall be limited to the " staging areas " indicated on the Drawings , or if not indicated , as mutually agreed between the Architect and Contractor at the Pre - Construction Conference . 11 . Smoking or other use of tobacco products shall not be permitted within the structure of the Building , Owner ' s facilities or on roofs . 12 . The use or presence of alcohol and / or other debilitating substances shall not be permitted in the construction of the building and or on the project site . 13 . Firearms and / or other weapons shall not be permitted on the project site . 14 . The Contractor shall furnish necessary temporary toilets for all work forces on the job site . |
Location
Country | United States of America (USA) |
State | Alabama |
Source
Source | Alabama Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Education, Car parking, Commercial, Automotive, Residential, Road |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
