logo
TenderClosed

Re - Roofing Saks High School Gym For The Calhoun County Board Of Education

Closed · Alabama · Last reported Apr 2026

Source: Alabama Purchasing Group

PROJECT / WORK IDENTIFICATION A . General : Project name is as indicated in the Advertisement For Bids and as shown on the Contract Documents prepared by McKee & Associates , 631 S . Hull Street Montgomery , Alabama 36104 . B . Contract Documents : Indicate the work of the Contract and related requirements and cond

Status
Closed
Sector
Education, Car parking, Commercial, Automotive, Residential, Road
Location
Alabama, United States of America
Updated
3 Nov 2026
Source
Alabama Purchasing Group

ConstructChat

Ask ConstructChat about Re - Roofing Saks High School Gym For The Calhoun County Board Of Education

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Re - Roofing Saks High School Gym For The Calhoun County Board Of Education” is a tender record in Taiyo, linked to the Education sector. It is issued for works, goods, or services related to Alabama, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

PROJECT / WORK IDENTIFICATION A . General : Project name is as indicated in the Advertisement For Bids and as shown on the Contract Documents prepared by McKee & Associates , 631 S . Hull Street Montgomery , Alabama 36104 . B . Contract Documents : Indicate the work of the Contract and related requirements and conditions that have an impact on the project . Related requirements and conditions that are indicated on the Contract Documents include , but are not limited to the following : 1 . Existing site conditions and restrictions on use of the site including ingress and egress to the site . 2 . Grading operations at the site . 3 . The Contractor shall be responsible to secure the site during the execution of the work and provide proof of insurance including but not limited to General Liability , W / C , Auto , Equipment , etc . C . Summary by References : Work of the Contract can be summarized by references to the Contract , General Conditions , Supplementary Conditions , the Project Manual , Technical Specification Sections , Drawings , Addenda and modifications to the Contract Documents issued subsequent to the initial printing of this Project Manual and the Drawings , and including but not necessarily limited to , printed material referenced by any of the above . It is recognized that the Work of the Contract is also unavoidably affected or influenced by governing regulations , natural phenomenon including weather conditions , and other forces outside the contract documents . CONTRACTOR USE OF PREMISES A . General : During the entire cleanup period the Contractor shall have the exclusive use of the premises for cleanup operations , including full use of the site as shown on the Drawings . B . Limitations of exclusive use of the site : 1 . Confine operations at the site to the areas permitted under the Contract . Portions of the site beyond areas on which work is indicated are not to be disturbed . Conform to applicable rules and regulations affecting the work while engaged in project performance . See site plan for ingress and egress to the site , or if not indicated , same shall be as designated by the Architect . 2 . Keep existing public roads , driveways and entrances serving the premises clear and available at all times . Do not use these areas for parking or storage of materials . Remove dirt , mud , debris , etc ., from site , sidewalks , streets , and public right - of - way as it occurs . 3 . Do not unreasonably encumber the site with materials or equipment . Confine stockpiling of materials and location of storage sheds and or designated storage areas as indicated . 4 . Lock automotive type vehicles , such as passenger cars and trucks and other mechanized or motorized construction equipment , when parked and unattended , so as to prevent unauthorized use . Do not leave such vehicles or equipment unattended with the motor running or the ignition key in place . 5 . The Owner , and their representatives , the Architect and their Consultants , as well as authorities having jurisdiction will require site accessibility for inspections , observations , and perhaps other purposes , related to the planned new construction . All Contractors shall assist in such accessibility , to at least the point of providing and maintaining accessible dry paths to work in progress . 6 . Furnish and install by contractor temporary barricades , fencing , etc ., as indicated or otherwise required , to restrict pedestrian and vehicular traffic from construction operations , including in part , Owner ' s staff , the public , students , children , and residents of the adjacent residential neighborhoods . 7 . Construction operations shall not affect in any manner , the on - going operations of the Owner , immediately adjacent facilities , adjacent property owners or businesses , or others . Refer to Division 1 Section " Special Conditions " for additional information and requirements regarding coordination with Owner ' s activities , etc . 8 . Construction equipment shall not come in contact with or swing over existing facilities to remain , public areas , occupied buildings , right - of - ways , etc ., which are to remain . 9 . All contractors and their employees shall limit any discussion of the Work of this project to the Owner ' s representatives named in the front of this Project Manual , Consultants employed , inspecting authorities with jurisdiction , and the Architect . In no instance shall this project be discussed with others , except as may otherwise be indicated herein . 10 . Parking on - site , if any , shall be limited to the " staging areas " indicated on the Drawings , or if not indicated , as mutually agreed between the Architect and Contractor at the Pre - Construction Conference . 11 . Smoking or other use of tobacco products shall not be permitted within the structure of the Building , Owner ' s facilities or on roofs . 12 . The use or presence of alcohol and / or other debilitating substances shall not be permitted in the construction of the building and or on the project site . 13 . Firearms and / or other weapons shall not be permitted on the project site . 14 . The Contractor shall furnish necessary temporary toilets for all work forces on the job site .

Location

Country

United States of America (USA)

State

Alabama

Source

Source

Alabama Purchasing Group

URL

More Details

Record type

Tender

Sector

Education, Car parking, Commercial, Automotive, Residential, Road

Article published date

2026-05-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender