Rebid Hard Labor Creek Reservoir Apalachee River Intake
The scope, dates and status of this tender. A free account opens every field.
REBID HARD LABOR CREEK RESERVOIR APALACHEE RIVER INTAKE Sealed bids will be received by the Walton County Water & Sewerage Authority for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the Rebid Hard Labor Creek Reservoir Apalachee River Intake in Walton County, GA. Bids will be received at the Walton County Water & Sewerage Authority, 2171 Highwa
- Status
- Closed
- Sector
- Road, Cement
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about Rebid Hard Labor Creek Reservoir Apalachee River Intake
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | under evaluation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | REBID HARD LABOR CREEK RESERVOIR APALACHEE RIVER INTAKE Sealed bids will be received by the Walton County Water & Sewerage Authority for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the Rebid Hard Labor Creek Reservoir Apalachee River Intake in Walton County, GA. Bids will be received at the Walton County Water & Sewerage Authority, 2171 Highway 81, Loganville, GA 30052 until 2:00 p.m. local time on Thursday, April 23, 2026. Any bid received after said time and date of bid opening will not be considered by OWNER. Bids will be publicly opened and read aloud at this time and location. All bids will be evaluated by OWNER and the project will be awarded, if it is awarded, within sixty (60) days of the bid opening. The Project consists of, but is not limited to the following major elements: Construction of an in-river channel to the intake structure, a cast-in-place concrete intake structure, an entrance road, grading, security fencing, landscaping, and additional associated work as specified and indicated in the contract documents. Time of completion for all work associated with Rebid Hard Labor Creek Reservoir Apalachee River Intake shall be THREE HUNDRED SIXTY-FIVE (365) consecutive calendar days of the date specified in a written ¿Notice to Proceed¿ from OWNER. Copies of Contract Documents, Specifications, and Construction Drawings may be obtained from Precision Planning, Inc. upon an email request for plans to Natalie Pifer 861np@ppi.us. |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Road, Cement |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States
- Network Rail Commercial Property Maintenance Framework PSQ
- RFP - 2026-08-001
- SB011-27 822 Leonard Court Sinkhole Repair
- FREEDMAN GROVE ROAD ROADWAY IMPROVEMENTS
- RFP 26-20, On-Paving - Annual Contract
- SB013-26 Raised Intersections for Crogan Street at Perry Street and Clayton Street at Pike Street
- Road Work Bids- Resurface Macgruder Road
- Woodlawn Dr & Claxton Dairy Rd Roundabout
