RECS RFP DESIGN PERA SPACE PLANNING MRS BLDG
The scope, dates and status of this tender. A free account opens every field.
Source: Minnesota Purchasing Group
The goal of this RFP is to enter into a contract to obtain services with the best value responder . The State has the right to cancel this solicitation if it is considered to be in its best interest . 1 . 0 Project Overview : 1 . 1 Project Scope : a . Remodel of office space on approximately 35 , 000
- Status
- Closed
- Sector
- Government, Commercial, Residential
- Location
- Minnesota, United States of America
- Updated
- 3 Nov 2026
- Source
- Minnesota Purchasing Group
ConstructChat
Ask ConstructChat about RECS RFP DESIGN PERA SPACE PLANNING MRS BLDG
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The goal of this RFP is to enter into a contract to obtain services with the best value responder . The State has the right to cancel this solicitation if it is considered to be in its best interest . 1 . 0 Project Overview : 1 . 1 Project Scope : a . Remodel of office space on approximately 35 , 000 sf . b . Demo of six offices on 4th floor . c . Rework of offices on 2nd floor to other types of spaces such as conference rooms , huddle rooms , etc . d . Reconfiguration mechanical , electrical , low voltage , lighting , and AV design for new furniture , offices , conference rooms , etc . e . Determining newly renovated spaces are to code . f . Revaluate spaces for acoustics and wall coverings on 2nd floor . g . Provide detailed cost breakdown ( s ) to the State at end of SD , DD and CD Phase . h . A licensed architect with considerable experience in similar renovation projects shall be the lead for the consultant team . i . The State will have biweekly scheduled conference calls during the design phase . Weekly schedule on - site and / or conference calls will take place during the construction phase . j . Consultant is required to provide on - site construction administration during construction phase and provide weekly progress reports to the State . k . Deliverables for the project from design through post construction is outlined in BSADC Attachments 1 - 6 towards the back of this exhibit . l . Consultants and subconsultants need to abide by the requirements and policies of the Minnesota State Retirement Systems Guidelines located at https :// mn . gov / admin / government / construction - projects / manuals - guidelinesforms / guidelines /. m . Reference Fit plans attached Exhibit A1 – PERA Second Floor and Exhibit A2 – PERA Fourth Floor are available in SWIFT . This design may change throughout the process as we get further into design . |
Location
Country | United States of America (USA) |
State | Minnesota |
Source
Source | Minnesota Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Government, Commercial, Residential |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Government tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Fuel Tank Inspection and Repair Services
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- Dual Trash and Recycling Receptacles
- Annual Inspection Testing of Aerial Devices and Digger Derricks
- 23B48LS Transit Bus Engines
- Heavy Duty Trucks and Equipment Parts and Accessories
- Automotive and Light Truck Parts and Accessories
