logo

Red Clay S . P . Pavilion Siding & Fence Replacement

Sector: Water Supply and Storage • Location: Tennessee, United States of America

Source: Tennessee Purchasing Group

Tender
Closed

1 ) Pavillion : a . The Contractor shall remove existing siding , trim , and gutters . b . The Contractor shall remove all lattice and associated framing . c . The Contractor shall remove old water fountain box to the right of the fireplace . d . The Contractor shall remove exposed conduit on fireplace wall to be

Status
Closed
Sector
Water Supply and Storage, Rail, Commercial, Cement, Residential
Location
Tennessee, United States of America
Updated
3 Nov 2026
Source
Tennessee Purchasing Group

ConstructChat

Ask ConstructChat about Red Clay S . P . Pavilion Siding & Fence Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Red Clay S . P . Pavilion Siding & Fence Replacement” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Tennessee, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 ) Pavillion : a . The Contractor shall remove existing siding , trim , and gutters . b . The Contractor shall remove all lattice and associated framing . c . The Contractor shall remove old water fountain box to the right of the fireplace . d . The Contractor shall remove exposed conduit on fireplace wall to be ran in wall with MC Cable . e . The Contractor shall remove both exterior condensing units and all signage and retain for re - installation . f . The Contractor shall remove the lights over each restroom door . 2 ) Park Fencing : a . The Contractor shall remove split rail fencing at the Front Gate , South Entrance and approximately 800 - feet along the roadside between entrances . New Work 1 ) Pavillion : a . The Contractor shall re - install switches for lights and fans to match original locations and cut into wall . Junction boxes shall be relocated where they will not be cut into new siding . b . The Contractor shall install blocking to re - hang units for restrooms . c . The Contractor shall install new fiberglass reinforced concrete siding and trim to manufacturer specifications . d . The Contractor shall install new LP Smartside Engineered Treated Composite fascia boards . e . The Contractor shall wrap all support posts with LP Smartside to create the appearance of solid columns . Bolt caps shall be placed over the exposed bolts and post skirts shall be constructed from 1x6 PVC boards . The top side of the boards shall be beveled at least 30 degrees to shed water ...

Location

Country

United States of America (USA)

State

Tennessee

Source

Source

Tennessee Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Rail, Commercial, Cement, Residential

Article published date

2026-05-15

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender