Reed Bed Installation at Nant-y-Caws Landfill Treatment Plant
One of 10,000+ tenders Taiyo tracks in United Kingdom.
Source: Open Contracting Data Standard (OCDS)
Installation of a bespoke reed bed system at the Nant-y-Caws Landfill Leachate Treatment Plant which is required to ensure all-year-round compliance of the site’s NRW environmental permit conditions with respect to total nitrogen content of treated effluent.
- Status
- Closed
- Sector
- Fertilizers
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Reed Bed Installation at Nant-y-Caws Landfill Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Installation of a bespoke reed bed system at the Nant-y-Caws Landfill Leachate Treatment Plant which is required to ensure all-year-round compliance of the site’s NRW environmental permit conditions with respect to total nitrogen content of treated effluent. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Fertilizers |
Article published date | 2026-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Fertilizers tenders in United Kingdom
- LAB1040 AP - Mass Spectrometry & Chromatography Equipment (APUC)
- Alternative Method of Bulk Nitrogen Supplies for Dounreay Site - Phase 2
- Procurement of Testing Campaign Using a Packed Bed Flow Reactor – PP-UKIFS - 458
- National Focal Centre (NFC) to Model and Map Air Pollution Impacts on UK habitat
- Maintaining, Automatic Air Quality Monitoring on SRN (NAQMN)
- ES RDE 010 - Clun Nature Recovery Blueprint
- Supply of Lithium Battery Set Up For Cowes Floating Bridge
- Framework for the Supply of Solutions, Reagents and Serums
