Regional Water Planning and Pipeline Development
Sector: Water Supply and Storage • Location: Kansas, United States of America
Source: Kansas Purchasing Group
The selected consultant will be responsible for the following tasks and will produce the corresponding deliverables : 4 . 2 . 1 . Task 1 : Current State Assessment & Data Compilation - The consultant will compile and analyze existing data to establish a baseline understanding of the region ' s current water resources
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Manufacturing (Industrial), Commercial
- Location
- Kansas, United States of America
- Updated
- 3 Nov 2026
- Source
- Kansas Purchasing Group
ConstructChat
Ask ConstructChat about Regional Water Planning and Pipeline Development
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The selected consultant will be responsible for the following tasks and will produce the corresponding deliverables : 4 . 2 . 1 . Task 1 : Current State Assessment & Data Compilation - The consultant will compile and analyze existing data to establish a baseline understanding of the region ' s current water resources , infrastructure , and usage patterns . • Deliverable 1 . 1 : Data Inventory & Gap Analysis Report : o Content : A comprehensive inventory of all relevant existing data pertaining to water supply , demand , quality , and infrastructure within the Regional Planning Area ( s ). This will include ( but not be limited to ): Water Supply : Historical streamflow records , groundwater level data , aquifer levels ( e . g ., sustainable yield from existing models and data ), reservoir capacities and yields , and existing water rights / permits . Water Demand : Current water use / demand for all major uses of water in the region ( s ) as well as statutorily required minimum desirable streamflow ; existing population figures for communities . Water Quality : Recent and historical water quality monitoring data for surface and groundwater sources ( e . g ., contaminant levels , nutrient loads , TDS ). Infrastructure : Existing water treatment plant capacities , distribution system maps , and known infrastructure condition assessments . o Gap Analysis : Identification of critical data gaps and recommendations for future data collection efforts necessary for robust long - term planning . 4 . 2 . 2 . Task 2 : 50 - Year Water Supply & Demand Projections - The consultant will develop robust projections for water availability and water demand over a 50 - year planning horizon ( e . g ., 2025 - 2075 ). • Deliverable 2 . 1 : 50 - Year Water Supply Projections Report . o Content : Detailed projections of long - term water availability from all significant sources ( surface water , groundwater ) within the region ( s ). This must incorporate : Drought Resiliency : Assessment of water supply reliability under extreme drought scenarios , including increases in the severity of the drought by 10 % ( e . g ., reducing precipitation of the historical drought of record for Kansas ). Sustainable Yields : Determination of the reliability of groundwater aquifers to meet future demands , considering current and projected pumping rates . Water Quality Impacts on Supply : Analysis of how projected water quality degradation ( e . g ., taste , odor , Safe Drinking Water Act - regulated contaminants ) might diminish the usable supply without additional treatment . • Deliverable 2 . 2 : 50 - Year Water Demand Projections Report . o Content : Comprehensive projections of future water demand across all sectors within the region ( s ), encompassing : Population Trends : Utilization of state - approved population forecasts for all communities and unincorporated areas and projected associated water demands . Economic & Land Use Trends : Projections for industrial , commercial , and agricultural water use based on economic development and land use plans . Conservation Potential : Analysis of potential water savings through enhanced conservation measures in each sector ... |
Location
Country | United States of America (USA) |
State | Kansas |
Source
Source | Kansas Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Raw Materials, Manufacturing (Industrial), Commercial |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
