REHABILITATION OF SHARSON PARK BRIDGE & RIVER TRAIL BRIDGE
Sector: Bridge • Location: Connecticut, United States of America
Source: Connecticut Purchasing Group
Work under this item shall consist of the partial or complete removal and off - site disposal of existing structural steel members , including but not limited to girders ( or portions of girders ), diaphragms , stiffeners , connection plates , and miscellaneous steel , at the locations shown on the Plans or as dir
- Status
- Closed
- Sector
- Bridge, Steel, Forest Products and Packaging
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about REHABILITATION OF SHARSON PARK BRIDGE & RIVER TRAIL BRIDGE
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Work under this item shall consist of the partial or complete removal and off - site disposal of existing structural steel members , including but not limited to girders ( or portions of girders ), diaphragms , stiffeners , connection plates , and miscellaneous steel , at the locations shown on the Plans or as directed by the Engineer . This work shall also include the design , furnishing , installation , maintenance , and removal of all temporary shoring , bracing , supports , and other temporary works required to safely perform the steel removal operations and to maintain structural stability . Temporary works shall be provided as required by the Contract Documents , including but not limited to the requirements of the “ Jacking for Bearing Pedestal Repairs ” 2 . 0 Materials : All structural steel , timber , and miscellaneous materials removed under this item shall be disposed of off - site by the Contractor in accordance with applicable regulations , unless otherwise noted on the Plans or directed by the Engineer . Limits of removal shall be as shown on the Plans or as approved by the Engineer . 3 . 0 Construction Methods : The Contractor shall prepare and submit written procedures , working drawings , and design calculations for the proposed removal operations and all temporary shoring / bracing in accordance with Article 1 . 05 . 02 of the CT Standard Specifications ( Form 819 ). Working drawings and calculations shall be prepared and sealed by a Professional Engineer licensed in the State of Connecticut . No removal work shall begin until the Engineer has reviewed and accepted the Contractor ’ s submittals . All work shall be performed in accordance with the Plans , these specifications , and as directed by the Engineer . The Contractor shall perform steel removal in a controlled manner to prevent damage to any permanent construction ( new or existing ), remaining structural elements , utilities , adjacent property , and areas below the structure . The Contractor shall provide shielding , containment , and protection measures as necessary to prevent debris , tools , or materials from falling into areas below the bridge . Any damage resulting from the Contractor ’ s operations shall be repaired or replaced by the Contractor to the satisfaction of the Engineer at no additional cost to the State or Town . |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Bridge, Steel, Forest Products and Packaging |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in United States of America
- FY2023 Patch Truck
- 20222023 Bridge Preventive Maintenance Program
- Small Bridge Design Services Various Locations throughout Ocean County
- Pipeline Trail Phase 1 Project
- Construction Engineering Inspection Services for FDOT LAP Bridge Projects
- Miccosukee Road Bridge Replacement
- Bridge Design Services 3 Bridges on CTH BB CTH N and CTH TT
- Emergency Repairs to HHW & Power Facilities Following the Ma...
