Remnant Dam Removal and Stream Restoration Final Design - Cabot , VT
One of 1,967 tenders Taiyo tracks in Vermont.
Source: Vermont Purchasing Group
The work will be conducted in two phases : 1 ) Preliminary Design ( 30 %) and 2 ) Final Design ( 100 %). The project will only proceed to Final Design if there is a feasible and acceptable Preliminary Design . The Consultant will meet with the Project Team at each stage ( Kickoff , Alternatives Analysis , 30 %, a
- Status
- Closed
- Sector
- Hydro
- Location
- Vermont, United States of America
- Updated
- 3 Nov 2026
- Source
- Vermont Purchasing Group
ConstructChat
Ask ConstructChat about Remnant Dam Removal and Stream Restoration Final Design - Cabot , VT
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The work will be conducted in two phases : 1 ) Preliminary Design ( 30 %) and 2 ) Final Design ( 100 %). The project will only proceed to Final Design if there is a feasible and acceptable Preliminary Design . The Consultant will meet with the Project Team at each stage ( Kickoff , Alternatives Analysis , 30 %, and 100 %) to discuss topics such as scope of work , methods , deliverables , and project timeline . The Consultant will prepare Opinions of Probable Costs for implementation , work with the Project Team to obtain permits and approvals , and prepare a construction bid package for the project . In addition to Friends of the Winooski River , the Project Team may include representatives from the US Fish and Wildlife Service , US Army Corps of Engineers , VT Department of Fish and Wildlife , VT River Management Program , VT Wetlands Program , VT Floodplains Program , and the Town of Cabot . The design will need to meet state and federal permit criteria . Preliminary Design The goal of this phase is to collect field data , analyze the data through appropriate models , and produce an alternatives analysis and 30 % design for the best option to achieve project objectives . The Consultant will collaborate throughout this step with the Project Team as needed to ensure an acceptable final product . This step may involve a feasibility or alternatives analysis . 1 . Data Collection : Survey limits shall extend a sufficient distance to define existing features related to the project site and provide sufficient information to complete a hydraulic analysis . Data collection will include , but is not limited to : 1 . 1 . Review existing information provided by FWR along with other relevant resources . 1 . 2 . Define channel morphology through geomorphic measurements , characterization of bed substrate , channel type , and condition . 1 . 3 . Perform a channel survey documenting existing site conditions . This will include channel cross sections upstream and downstream of the structure and a longitudinal profile . The profile should extend 2 , 500 feet upstream to the point where channel stability increases and downstream to a distance of 20 - 30x the bankfull width . 1 . 4 . Document infrastructure that may be affected by the project and other site features relevant to the design . 1 . 5 . Conduct sediment probing and bank soil testing for potential contaminants . 1 . 6 . Delineate wetlands adjacent to the channel throughout project limits . |
Location
Country | United States of America (USA) |
State | Vermont |
Source
Source | Vermont Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Hydro |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United States of America
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Bay Corridor Transmission & Distribution - Phase 2 (2019) S...
- College Hill Reservoir Outlet Structure And Pipeline
- Bay Corridor Transmission and Distribution - Phase 3 (2019)
- Regional Groundwater Storage and Recovery
- Fillmore and Haight Street Intersection AWSS, Pavement, and ...
- REJECTED: Southeast Water Pollution Control Plant Power Feed...
- Turner Dam Spillway and Pond F3 East Erosion Repair
