Removal and Replacement of ceiling tiles and grids at Red Bud Elementary Buildings 2011 & 2030
The scope, dates and status of this tender. A free account opens every field.
Source: Georgia Purchasing Group
The Gordon County School System (“ GCSS ”) is seeking proposals for the removal and installation of ceiling tiles and grids at Red Bud Elementary . Scope of Work 1 . Removal of Existing Ceiling System • Carefully remove the existing ceiling grid and tiles . • Properly dispose of all removed materials in accord
- Status
- Closed
- Sector
- Commercial
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about Removal and Replacement of ceiling tiles and grids at Red Bud Elementary Buildings 2011 & 2030
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Gordon County School System (“ GCSS ”) is seeking proposals for the removal and installation of ceiling tiles and grids at Red Bud Elementary . Scope of Work 1 . Removal of Existing Ceiling System • Carefully remove the existing ceiling grid and tiles . • Properly dispose of all removed materials in accordance with applicable regulations . • Protect existing HVAC , electrical , and fire protection systems during removal . 2 . Installation of New Ceiling System • Supply and install a new 2x2 ceiling grid system that meets industry standards and project specifications . • Supply and install new ceiling tiles per the approved specifications . • Ensure proper alignment , leveling , and secure installation of all ceiling components . • Accommodate existing HVAC vents , lighting fixtures , and other ceiling - mounted elements . 3 . Compliance and Coordination • Perform all work in compliance with applicable building codes , safety regulations , and industry standards . • Coordinate with the owner ’ s representatives and other contractors to minimize disruptions to facility operations . • Conduct quality control inspections to verify proper installation and finishing . 4 . Site Cleanup and Final Inspection • Remove all construction debris and materials from the site . • Conduct a final walkthrough with the owner ’ s representative to confirm satisfactory completion . • Address any deficiencies prior to project closeout . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Commercial |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
