logo

Removal and Replacement of ceiling tiles and grids at Red Bud Elementary Buildings 2011 & 2030

The scope, dates and status of this tender. A free account opens every field.

Source: Georgia Purchasing Group

Tender
Closed

The Gordon County School System (“ GCSS ”) is seeking proposals for the removal and installation of ceiling tiles and grids at Red Bud Elementary . Scope of Work 1 . Removal of Existing Ceiling System • Carefully remove the existing ceiling grid and tiles . • Properly dispose of all removed materials in accord

Status
Closed
Sector
Commercial
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Purchasing Group

ConstructChat

Ask ConstructChat about Removal and Replacement of ceiling tiles and grids at Red Bud Elementary Buildings 2011 & 2030

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Removal and Replacement of ceiling tiles and grids at Red Bud Elementary Buildings 2011 & 2030” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Gordon County School System (“ GCSS ”) is seeking proposals for the removal and installation of ceiling tiles and grids at Red Bud Elementary . Scope of Work 1 . Removal of Existing Ceiling System • Carefully remove the existing ceiling grid and tiles . • Properly dispose of all removed materials in accordance with applicable regulations . • Protect existing HVAC , electrical , and fire protection systems during removal . 2 . Installation of New Ceiling System • Supply and install a new 2x2 ceiling grid system that meets industry standards and project specifications . • Supply and install new ceiling tiles per the approved specifications . • Ensure proper alignment , leveling , and secure installation of all ceiling components . • Accommodate existing HVAC vents , lighting fixtures , and other ceiling - mounted elements . 3 . Compliance and Coordination • Perform all work in compliance with applicable building codes , safety regulations , and industry standards . • Coordinate with the owner ’ s representatives and other contractors to minimize disruptions to facility operations . • Conduct quality control inspections to verify proper installation and finishing . 4 . Site Cleanup and Final Inspection • Remove all construction debris and materials from the site . • Conduct a final walkthrough with the owner ’ s representative to confirm satisfactory completion . • Address any deficiencies prior to project closeout .

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Purchasing Group

URL

More Details

Record type

Tender

Sector

Commercial

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender