logo

REMOVAL AND REPLACEMENT OF RAISED FLOOR PANELS

Bids closed Apr 2026 · New York · Last reported Mar 2026

Source: Empire State Purchasing Group

Tender
Closed

A . RFQ Goals and Objectives The Comptroller ’ s Office is seeking to award a contract to a responsible contractor to provide Removal and Replacement of Raised Floor Panels for 1 Centre Street ( Labor and Services ) at the Workspace as such services are described in Section III of this RFQ . B . Scope of

Status
Closed
Sector
Car parking, Commercial, Automotive, Residential, Road
Location
New York, United States of America
Updated
3 Nov 2026
Source
Empire State Purchasing Group

ConstructChat

Ask ConstructChat about REMOVAL AND REPLACEMENT OF RAISED FLOOR PANELS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “REMOVAL AND REPLACEMENT OF RAISED FLOOR PANELS” is a tender record in Taiyo, linked to the Car parking sector. It is issued for works, goods, or services related to New York, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

A . RFQ Goals and Objectives The Comptroller ’ s Office is seeking to award a contract to a responsible contractor to provide Removal and Replacement of Raised Floor Panels for 1 Centre Street ( Labor and Services ) at the Workspace as such services are described in Section III of this RFQ . B . Scope of Services : The Contractor shall provide all labor and material to perform provide Removal and Replacement of Raised Floor Panels at the Comptroller ’ s Office located at 1 Centre Street , New York , NY 10007 . The Comptroller ’ s Office is located on multiple floors of the building . General Description of Work 1 . Materials : The Contractor shall : • Use environmentally preferable products and materials that have a less or reduced effect on human health and environment when compared to other products that serve the same purpose . • Prior to the start of work , the Contractor shall also maintain and provide Safety Data Sheets for all materials and / or Chemicals used to treat the carpet . 2 . Supervision : The Contractor shall provide at least one supervisor who must have at least ( 2 ) years of experience in supervising the work to be performed . Supervision shall be present at all times during execution of the work , and shall be thoroughly familiar with the specified requirements , materials and methods needed for execution of work . Contractor shall meet with Facilities Director at least one ( 1 ) week prior to the start of the project to conduct a full walk through and schedule the work . Contractor will supply adequate labor to complete the work in the specified timeframes . The Contractor and employees must be capable of and experienced in the work to be performed . Assigned staff must have at least ( 6 ) months experience with your company . 3 . Description of Work : Removal and Replacement of Raise Floor Panels for Room 1225 : • Furnish labor to remove and discard approximately 5 , 500 sq . feet of customer ’ s existing access floor panels • Furnish and install ( 1 , 000 ) CE 1250 lb . wood core access floor panels with a Mohawk carpet finish and trim edge • Furnish and install ( 380 ) CE 1250 lb . wood core access floor panels with a 1 / 16 ” high pressure laminate finish – Cheyenne with black trim edge • Furnish labor to remove and discard existing damaged rubber matting • Furnish and install new 2 ’ x 2 ’ raised rubber disc rubber matting • Delivery of all materials will be through the use of a freight elevator . Please note that there is no onsite parking . The awarded vendor must use street parking , and delivery of all materials must be walked over / hand - delivered to 1 Centre Street freight elevator . 4 . Comptroller ’ s Office Responsibilities : • The Comptroller ’ s Office will remove all items from the floor . • The Comptroller ’ s Office shall provide access to space and supervision during the cleaning . • The Comptroller ’ s Office will coordinate moving office furniture and computers if necessary . • Freight access and loading zone information to load / unload material will be provided . However , the Comptroller ’ s Office will not provide parking and storage space for materials 5 . Work Schedule : • All work shall be scheduled in phases , based on consecutive weekdays ( Monday - Friday , between the hours of 7 : 00 A . M . to 8 : 00 P . M ., excluding holidays ). • If necessary , and with prior written approval from the Comptroller ’ s Office , work may be scheduled on Saturdays . • The selected vendor must provide a duration schedule based on above hours , ensuring adequate labor to complete the work . • No work is permitted on Sundays . 6 . Completion : • At the completion of work , the Contractor shall make good at its own expense , any work that is improperly finished by him or his crew prior to completion of all work . • Upon completion of the work , all surplus materials , empty packages and debris shall be removed from the premises and left in a neat and satisfactory condition .

Location

Country

United States of America (USA)

State

New York

Source

Source

Empire State Purchasing Group

URL

More Details

Record type

Tender

Sector

Car parking, Commercial, Automotive, Residential, Road

Article published date

2026-05-05

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender