Removal/Deconstruction/Disposal of the MV Capt. Earl W. Winsor

One of 10,000+ tenders Taiyo tracks in Canada.

Source: Canada Buy and Sell

Tender
Open

Requirement

The Contractor must prepare to dismantle and dispose/recycle, the vessel Capt. Earl W. Winsor in an efficient and environmentally responsible manner in accordance with Canadian Laws, regulations and referenced guidelines and approved Ship Recycling Plan. If required, the contractor must prepare the vessel for transfer and/or tow to an Approved Site.

Background

The MV Capt. Ea

Status
Bidding
Sector
Water Supply and Storage, Government, Road, Oil and Gas, Steel, Seaport, Commercial, Metal
Location
Canada
Updated
3 Nov 2026
Source
Canada Buy and Sell

ConstructChat

Ask ConstructChat about Removal/Deconstruction/Disposal of the MV Capt. Earl W. Winsor

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Removal/Deconstruction/Disposal of the MV Capt. Earl W. Winsor” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Canada.

Participants

Not available for this record.

Status

Original status

open

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Requirement The Contractor must prepare to dismantle and dispose/recycle, the vessel Capt. Earl W. Winsor in an efficient and environmentally responsible manner in accordance with Canadian Laws, regulations and referenced guidelines and approved Ship Recycling Plan. If required, the contractor must prepare the vessel for transfer and/or tow to an Approved Site. Background The MV Capt. Earl W Winsor was constructed in 1972 as the Prince Edward for service between Nova Scotia and Prince Edward Island. In 1998 it was purchased by the Province of Newfoundland, retrofitted and renamed the Capt. Earl W Winsor the vessel remained in service until 2016. In 2018 the vessel was sold by the province and towed to Springdale, NL. The vessel has been laid up ever since. In February 2024 an overboard discharge pipe burst and the vessel experienced extensive down flooding throughout the below deck spaces. The Canadian Coast Guard – Marine Environmental and Hazards Response program responded in February 2024 to stabilize the vessel and removed approximately 1000 M3 of contaminated water and again in December 2024 to remove the bulk oil pollutants from the vessel. Particulars of the Vessel The particulars of the vessel are: Name: CAPT. EARL W. WINSOR Type of Vessel: Roll on / Roll off Ferry Builder: Pictou, N.S. Built: 1972 / Modified St John’s Nfld. 1998 Official Number: 331725 Port of Registry: Not Registered Length overall: 249’ Breadth Moulded: 53’ 6” Depth Moulded: 18’ GRT: 1772 NRT: 927 Displacement: 2,161LT at Load Line Operational Displacement: 1,589LT Deadweight: 584LT Material: Steel Period of the Contract The period of the Contract is from Contract award until [7 months after Contract award date] (exact date will be provided at Contract Award). Security There is no security applicable to this requirement. Trade Agreements The requirement is subject to the Canada-Chile Free Trade Agreement (CCFTA), Canada-Colombia Free Trade Agreement, Canada-Peru Free Trade Agreement (CPFTA), World Trade Organization-Agreement on Government Procurement (WTO-AGP), Canada-Panama Free Trade Agreement, Canada-Korea Free Trade Agreement (CKFTA), Canada - Ukraine Free Trade Agreement (CUFTA), Canada - European Union Comprehensive Economic and Trade Agreement (CETA), Canada-Honduras Free Trade Agreement, the Comprehensive and Progressive Agreement for Trans-Pacific Partnership (CPTPP), and the Canadian Free Trade Agreement (CFTA). Mandatory Requirements Proposals will be evaluated in accordance with the mandatory evaluation criteria as detailed herein. Bidders’ Proposals must clearly demonstrate that they meet all Mandatory Requirements for the proposal to be considered for further evaluation. Proposals not meeting the mandatory criteria will be excluded from further consideration. Summary of Mandatory Criteria M1 The bidder MUST have a minimum of sixty (60) months (5 years) experience in the Marine Salvage or Marine Commercial Industry, within the last 15 years from the date of bid closing M2 The Bidder MUST have completed pollutant removal and dismantling operations on steel hulled vessels on two (2) separate occasions within the last 15 years from the date of bid closing. M3 The Bidder must identify Key Personnel* that MUST have experience in each of the following areas: 1. Pollutant removal 2. Marine survey and stability assessments 3. Steel hull vessel deconstruction and recycling operations M4 The Bidder MUST provide a response plan with its technical proposal that demonstrates how they will perform the removal of the MV Captain Earl Winsor in accordance with the Statement of Work (Annex A). The response plan must include all of the following items: M4.1 Accessing the vessel and Bulk pollutant removal M4.2 Dismantling and recycling the vessel M4.3 Timeline of operations Selection Method The basis of selection is Mandatory Technical Criteria – Lowest Evaluated Price. Please refer to the RFP document for complete details.

Location

Country

Canada

Source

Source

Canada Buy and Sell

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Government, Road, Oil and Gas, Steel, Seaport, Commercial, Metal

Article published date

2025-11-19

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender