Renaissance Center HVAC Improvements
One of 10,000+ tenders Taiyo tracks in Illinois.
Source: Illinois Purchasing Group
This Project consists of the removal of the existing hydronic heating equipment and the installation of a new radiant heating distribution system serving the Renaissance Center Building located on the City Center Campus of Joliet Junior College . The Work includes removal of the existing boilers , cast - iron
- Status
- Closed
- Sector
- Nuclear, Geothermal, Metal, Commercial
- Location
- Illinois, United States of America
- Updated
- 3 Nov 2026
- Source
- Illinois Purchasing Group
ConstructChat
Ask ConstructChat about Renaissance Center HVAC Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This Project consists of the removal of the existing hydronic heating equipment and the installation of a new radiant heating distribution system serving the Renaissance Center Building located on the City Center Campus of Joliet Junior College . The Work includes removal of the existing boilers , cast - iron radiators , and associated hydronic piping systems and the installation of a new radiant heating system consisting of fin tube radiation , radiant ceiling panels , circulation pumps , hydronic piping distribution , thermostats , pressure independent control valves , destratification fans , and integration with the existing Building Automation System ( BAS ). The radiant heating system shall be connected to the existing condensing boiler loop located within the City Center Building and shall provide stable and energy - efficient heating distribution throughout the Renaissance Center facility . The Contractor shall install fin tube radiators along perimeter zones and radiant ceiling panels within interior zones in order to provide balanced radiant heat distribution . The Work further includes installation of four ceiling tile – type destratification fans within the atrium space to reduce vertical temperature stratification and improve thermal distribution during heating and cooling seasons . Where piping installation requires modifications to existing ceiling systems or interior finishes , the Contractor shall remove and reinstall ceiling grids , ceiling tiles , floor tiles , carpet systems , and other architectural finishes as necessary to complete the Work . All disturbed finishes shall be restored to a condition equal to or better than the original installation . The Project includes all labor , materials , equipment , controls , coordination , protection , demolition , installation , testing , commissioning , documentation , and Owner training necessary to deliver a complete , code - compliant , fully operational , and Owner - accepted hydronic heating system . The purpose of this Project is to improve temperature management throughout the Renaissance Center building , eliminate inefficiencies associated with the existing heating system , and provide a modern radiant heating system capable of maintaining stable environmental conditions appropriate for operational building loads . All Work shall be performed within an active campus environment and shall be coordinated with the Owner to minimize disruption to campus operations . |
Location
Country | United States of America (USA) |
State | Illinois |
Source
Source | Illinois Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Nuclear, Geothermal, Metal, Commercial |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
