Rend Lake Refuge - boat dock project
Bids closed Apr 2026 · Illinois · Last reported Apr 2026
Source: Illinois Purchasing Group
This project will include the Contractor providing all labor , equipment , and materials needed to upgrade the dock systems at Waltonville Dam Access Area and Nason South Access Area . Refer to Attachment 1 for Plan Drawings associated with this project . Specific tasks required at each facility are as follow
- Status
- Closed
- Sector
- Bridge, Hydro, Forest Products and Packaging, Car parking, Cement, Automotive
- Location
- Illinois, United States of America
- Updated
- 3 Nov 2026
- Source
- Illinois Purchasing Group
ConstructChat
Ask ConstructChat about Rend Lake Refuge - boat dock project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This project will include the Contractor providing all labor , equipment , and materials needed to upgrade the dock systems at Waltonville Dam Access Area and Nason South Access Area . Refer to Attachment 1 for Plan Drawings associated with this project . Specific tasks required at each facility are as follows : Waltonville Dam Access Area : Contractor shall remove the existing floating dock and float it across the channel to the Nason South Access Area , approximately ¾ mile . Once the existing dock is removed , Contractor shall re - position the bridge by pulling it in approximately 19 ’, with the rollers resting on the existing concrete sidewalk . The position of the bridge will be so that there is at minimum a 6 ” clearance between the face of the existing ramp footing and the new floating dock . Refer to Sheet E - 2 in Attachment 1 for the proposed dock elevation detail . One existing bridge structure has been re - positioned ; the Contractor shall install a new 6 ’ wide by 40 ’ long floating dock . Refer to the project specification below for details regarding the new floating dock structure . The Contractor shall provide a new 2 ’ 6 ” x 5 ’- 0 ” diamond tread trip plate and fasten it to the existing bridge as shown on the plan sheets . The tread plate shall be 3 / 16 ” thick . Nason South Access Area : Once the floating dock from the Waltonville Dam Access Area is floated to the Nason South Access Area , it shall be connected to the existing floating dock . The existing spud poles shall be removed so that the Contractor can re - position the bridge by pulling in approximately 19 ’, with the rollers resting on the existing concrete sidewalk . Again , the position of the bridge will be so that there is at minimum 6 ” clearance between the face of the existing ramp footing and the floating dock . Once the existing bridge structure and connected floating docks have been repositioned ; the Contractor shall re - drive the spud poles . Once dock system is secured , Contractor shall remove and replace the existing decking with treated southern pine # 1 lumber . The Contractor shall install composite roto molded perimeter bumper on the entirety of the dock system . Replace and damaged and / or missing cleats . The Contractor shall provide a new 2 ’ 6 ” x 5 ’- 0 ” diamond tread trip plate and fasten it to the existing bridge as shown on the plan sheets . The tread plate shall be 3 / 16 ” thick . |
Location
Country | United States of America (USA) |
State | Illinois |
Source
Source | Illinois Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Bridge, Hydro, Forest Products and Packaging, Car parking, Cement, Automotive |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in United States of America
- FY2023 Patch Truck
- 20222023 Bridge Preventive Maintenance Program
- Small Bridge Design Services Various Locations throughout Ocean County
- Pipeline Trail Phase 1 Project
- Construction Engineering Inspection Services for FDOT LAP Bridge Projects
- Miccosukee Road Bridge Replacement
- Bridge Design Services 3 Bridges on CTH BB CTH N and CTH TT
- Emergency Repairs to HHW & Power Facilities Following the Ma...
