Renovation of Kingsland Train Depot
One of 10,000+ tenders Taiyo tracks in Georgia.
Source: Georgia Purchasing Group
The Contractor shall furnish all labor , materials , equipment , supervision , and incidentals necessary to complete the project , including but not limited to the following tasks : 1 . Pre - Construction Activities o Conduct a site visit and field verification of existing conditions . o Coordinate work sequencing to min
- Status
- Closed
- Sector
- Rail, Commercial
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about Renovation of Kingsland Train Depot
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall furnish all labor , materials , equipment , supervision , and incidentals necessary to complete the project , including but not limited to the following tasks : 1 . Pre - Construction Activities o Conduct a site visit and field verification of existing conditions . o Coordinate work sequencing to minimize disturbance to historic materials . o Provide a protection plan for historic elements prior to beginning demolition . 2 . Historic Finish Floor Removal and Preservation o Carefully remove historic finish flooring in the affected area . o Label , document , and store flooring materials on - site or off - site in a secure , dry location to prevent damage . o Salvaged materials shall be preserved for reinstallation . 3 . Window and Door Removal and Preservation o Carefully remove the affected window and associated trim without damage . o Carefully remove the affected doorway components as required . o Preserve all historic windows , doors , and trim for reinstallation . 4 . Subfloor and Structural Repairs o Remove damaged subflooring in the affected area . o Inspect existing floor joists and supporting structural members . o Replace or sister floor joists as necessary to restore structural integrity . o All replacement materials shall be compatible with existing construction and meet applicable building codes . 5 . Subfloor Replacement and Flashing o Install new subflooring to match existing thickness and performance . o Install appropriate flashing and moisture protection at the window , doorway , and subfloor interface . 6 . Reinstallation of Historic Elements o Reinstall preserved historic flooring , window , door , and trim components . o Ensure finishes are level , secure , and visually consistent with existing conditions . o Repair or refinish salvaged materials as needed to return them to pre - removal condition . 7 . Final Cleanup and Closeout o Remove all debris from the site . o Restore the work area to a clean , safe condition . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Rail, Commercial |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Rail tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- PreQualification of Bidders for Chaboya Improvements
- TOWN OF MANCHESTER PARATRANSIT SERVICES
- Stormwater Management Improvements Ocean County Fire Training Facility Ocean Township
- Work Related Activity Providers Opioid Affected Individuals
- WORKPLACE HARASSMENT PREVENTION TRAINING
- Industry Review Phase Eastridge to BART Regional Connector
