Repair Leaking Stucco on Old Dome Pavilion
Sector: Water Supply and Storage • Location: Utah, United States of America
Source: Utah Purchasing Group
Phase 1 : Remove existing stucco , lathe and paper and windows between the flat roof and the copper dome cap . Care must be taken to prevent damaging the roof membrane during demolition . Remove all debris from the roof . The contractor will coordinate roof access points with Riverton City Project Manager .
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Forest Products and Packaging, Commercial
- Location
- Utah, United States of America
- Updated
- 3 Nov 2026
- Source
- Utah Purchasing Group
ConstructChat
Ask ConstructChat about Repair Leaking Stucco on Old Dome Pavilion
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Phase 1 : Remove existing stucco , lathe and paper and windows between the flat roof and the copper dome cap . Care must be taken to prevent damaging the roof membrane during demolition . Remove all debris from the roof . The contractor will coordinate roof access points with Riverton City Project Manager . Once demolition is complete , the Contractor and Riverton City officials will inspect the framing and OSB sheeting to insure there is no damage . Phase 2 : Wrap the outside sheeting with Tyvek HomeWrap ; install new windows , windows are to be vinyl , heavy reinforced , multi - chambered , insulated , black color frame , double pane , LoEi89 glass , grids to match existing windows , installed with 6 " bituthene window flashing , caulk and seal to make air tight seal ; Install 10 ' tall Hardie Panel , Select Cedarmill surface , with Hardie Trim on all corners and seams , primed ready for paint Install flashing and kickout flange between the copper dome cap and walls to prevent water from getting behind the Hardie Panel , install kickout flashing on the bottom . Caulk and paint the Hardie sheeting , color to match existing color on the building . Care must be taken to prevent damaging the roof membrane during construction . There are electrical boxes on the walls that will need to be moved and then placed back in order for the work to be done . Contractor will need to provide a portable restroom during construction . Contractor will need to access the roof from the outside . Contractor will need to provide a crane to get the equipment and materials on the roof . Contractor will need to provide interior scaffolding for window replacement . |
Location
Country | United States of America (USA) |
State | Utah |
Source
Source | Utah Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Metal, Forest Products and Packaging, Commercial |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
