Replace Oil Boilers - Cowick Church of England Voluntary Controlled primary School, Snaith Road
Complete · United Kingdom
Source: Open Contracting Data Standard (OCDS)
The work will involve the removal and replacement of the existing oil-fired heating boilers and associated plant within the existing boiler house. The works shall include, but not be limited to: • Removal and disposal of existing oil-fired boilers, associated flues and redundant ancillary equipment • Retention of the existing low loss header and secondary heating distribution once leaving the plan
- Status
- Closed
- Sector
- Commercial, Road, Oil and Gas
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Replace Oil Boilers - Cowick Church of England Voluntary Controlled primary School, Snaith Road
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The work will involve the removal and replacement of the existing oil-fired heating boilers and associated plant within the existing boiler house. The works shall include, but not be limited to: • Removal and disposal of existing oil-fired boilers, associated flues and redundant ancillary equipment • Retention of the existing low loss header and secondary heating distribution once leaving the plantroom and pressurisation equipment where serviceable. • Installation of 2no. new high efficiency condensing kerosene-fired boilers complete with flue systems, condensate drainage and associated ancillary equipment. • Replacement of existing boiler shunt pump set and heating circulation pump sets with new high efficiency ECM pumps. • Replacement of the existing boiler control panel and associated controls. • Modification of existing boiler house pipework and oil supply pipework to suit the replacement plant. • Renewal of exposed secondary heating flow and return pipework between the retained low loss header and the points where the services enter the ground for distribution throughout the building. • Removal and replacement of identified classroom radiators/convectors with low surface temperature (LST) radiators. • Associated electrical works, testing, commissioning, flushing, water treatment, balancing and recommissioning of the heating systems. I&F/M/Section 2/ADS/57486 • Provision of all builder’s work, making good, training, operation and maintenance manuals and handover documentation. • Management of the asbestos-containing materials associated with the works. • Liaise with the Client and all stakeholder parties regarding the execution of the scheme. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Commercial, Road, Oil and Gas |
Article published date | 2026-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
