Replacement Gas Boiler
One of 10,000+ tenders Taiyo tracks in United Kingdom.
Source: Open Contracting Data Standard (OCDS)
- Supply and install 3 times A rated ultra-high efficient condensing, wall hung gas boilers, having at least a combined thermal output of 165kw, to the basement area.
- Supply and install new horizontal twin flue technology system
- Supply and install cascade rig/frame system with a low loss header and associated fittings
- Supply and install pressurisation unit and expansion vessel
- Supply
- Status
- Bidding
- Sector
- Geothermal, Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Replacement Gas Boiler
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1. Supply and install 3 times A rated ultra-high efficient condensing, wall hung gas boilers, having at least a combined thermal output of 165kw, to the basement area. 2. Supply and install new horizontal twin flue technology system 3. Supply and install cascade rig/frame system with a low loss header and associated fittings 4. Supply and install pressurisation unit and expansion vessel 5. Supply and install magnetic filter to protect boilers from sludge/debris. 6. Supply and install new pipework and fittings to basement area as required 7. Undertake and complete all necessary electrical work required 8. Flush through, fill heating system and commission / test complete heating system. 9. Top up heating circuit with inhibitor to protect system from limescale/corrosion. 10. Decommission, drain down and remove the existing Seagold Broga boiler from basement in accordance to all legal requirements. 11. Decommission, drain down and remove storage tank from attic space in accordance with all legal requirements. 12. Complete necessary commercial certification 13. New installation must connect fully and efficiently with the existing Hive system. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Geothermal, Commercial |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Geothermal tenders in United Kingdom
- STF JULES Code Migration
- ENQ1316 - Highways Flame Resistant PPE
- Double Glazing Units Demist Repair Services
- MEP Tender Notice
- Supply of Validated Laboratory Labels and Thermal Transfer Ribbons For The AWMGS
- Cavity Wall Insulation Surveys
- Provision of Receipting and Treatment of WUDS/POPS Waste Material
- Repair, Maintenance and Servicing of Bin Chute Cut Offs and Refuse Hoppers
